共 50 条
- [43] Preemptive scheduling in a two-stage multiprocessor flowshop with resource constraints ICINCO 2006: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2006, : 130 - 135
- [44] Two-stage flexible flowshop scheduling with limited machine availability Proceedings of the First International Conference on Information and Management Sciences, 2002, 1 : 209 - 213
- [45] THE TWO-STAGE ASSEMBLY FLOWSHOP SCHEDULING PROBLEM WITH SETUP TIMES PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2029 - 2035
- [49] Minimizing total flow time in two-stage hybrid flowshop with parallel machines and a single batching machine 2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 344 - 349