Two-stage hybrid flowshop scheduling with simultaneous processing machines

被引:12
|
作者
Wang, Bailin [1 ,3 ]
Huang, Kai [2 ]
Li, Tieke [1 ,3 ]
机构
[1] Univ Sci & Technol Beijing, Donlinks Sch Econ & Management, Beijing 100083, Peoples R China
[2] McMaster Univ, DeGroote Sch Business, Hamilton, ON L8S 4M4, Canada
[3] Minist Educ, Engn Res Ctr MES Technol Iron & Steel Prod, Beijing 100083, Peoples R China
基金
中国国家自然科学基金; 北京市自然科学基金; 加拿大自然科学与工程研究理事会; 中国博士后科学基金;
关键词
Scheduling; Hybrid flowshop; Simultaneous processing machine; Heuristic; List scheduling; GENETIC ALGORITHM; CONSTRAINTS;
D O I
10.1007/s10951-017-0545-x
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Simultaneous processing machines, common in processing industries such as steel and food production, can process several jobs simultaneously in the first-in, first-out manner. However, they are often highly energy-consuming. In this paper, we study a new two-stage hybrid flowshop scheduling problem, with simultaneous processing machines at the first stage and a single no-idle machine with predetermined job sequence at the second stage. A mixed integer programming model is proposed with the objective of minimizing the total processing time to reduce energy consumption and improve production efficiency. We give a sufficient and necessary condition to construct feasible sequencing solutions and present an effective approach to calculate the time variables for a feasible sequencing solution. Based on these results, we design a list scheduling heuristic algorithm and its improvement. Both heuristics can find an optimal solution under certain conditions with complexity O(nlogn), where n is the number of jobs. Our experiments verify the efficiency of these heuristics compared with classical heuristics in the literature and investigate the impacts of problem size and processing times.
引用
收藏
页码:387 / 411
页数:25
相关论文
共 50 条
  • [1] Two-stage hybrid flowshop scheduling with simultaneous processing machines
    Bailin Wang
    Kai Huang
    Tieke Li
    Journal of Scheduling, 2018, 21 : 387 - 411
  • [2] A hybrid two-stage flowshop scheduling problem
    He, Longmin
    Sun, Shijie
    Luo, Runzi
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2007, 24 (01) : 45 - 56
  • [3] Sequencing a hybrid two-stage flowshop with dedicated machines
    Riane, F
    Artiba, A
    Elmaghraby, SE
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (17) : 4353 - 4380
  • [4] Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines
    Yimer, Alebachew D.
    Demirli, Kudret
    International Journal of Approximate Reasoning, 2009, 50 (01): : 117 - 137
  • [5] Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines
    Yimer, Alebachew D.
    Demirli, Kudret
    INTERNATIONAL JOURNAL OF APPROXIMATE REASONING, 2009, 50 (01) : 117 - 137
  • [6] A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
    Low, Chinyao
    Hsu, Chou-Jung
    Su, Chwen-Tzeng
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (03) : 845 - 853
  • [7] A two-stage hybrid flowshop with uniform machines and setup times
    Huang, W
    Li, S
    MATHEMATICAL AND COMPUTER MODELLING, 1998, 27 (02) : 27 - 45
  • [8] A note on two-stage hybrid flowshop scheduling with missing operations
    Tseng, Chao-Tang
    Liao, Ching-Jong
    Liao, Tai-Xiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (03) : 695 - 704
  • [9] Two-Stage Hybrid Flowshop Scheduling Problem with Waiting Time
    Sun, Heng
    Chung, Tsui-Ping
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 442 - 446
  • [10] Group scheduling in a two-stage flowshop
    Yang, WH
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (12) : 1367 - 1373