Risk analysis for flood control operation of seasonal flood-limited water level incorporating inflow forecasting error

被引:37
|
作者
Zhou, Yanlai [1 ]
Guo, Shenglian [1 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
基金
中国国家自然科学基金;
关键词
flood-limited water level; risk analysis; variable kernel estimation; inflow forecasting error; flood control operation; KERNEL ESTIMATION; RESERVOIR; DESIGN; FREQUENCIES; UNCERTAINTY; HYDROGRAPH; MODELS; SYSTEM;
D O I
10.1080/02626667.2014.901515
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
The seasonal flood-limited water level (FLWL), which reflects the seasonal flood information, plays an important role in governing the trade-off between reservoir flood control and conservation. A risk analysis model for flood control operation of seasonal FLWL incorporating the inflow forecasting error was proposed and developed. The variable kernel estimation is implemented for deriving the inflow forecasting error density. The synthetic inflow incorporating forecasting error is simulated by Monte Carlo simulation (MCS) according to the inflow forecasting error density. The risk analysis for seasonal FLWL control was estimated by MCS based on a combination of the forecasting inflow lead-time, seasonal design flood hydrographs and seasonal operation rules. The Three Gorges reservoir is selected as a case study. The application results indicate that the seasonal FLWL control can effectively enhance flood water utilization rate without lowering the annual flood control standard.
引用
收藏
页码:1006 / 1019
页数:14
相关论文
共 50 条
  • [31] The Dynamic Control Bound of Flood Limited Water Level Considering Capacity Compensation Regulation and Flood Spatial Pattern Uncertainty
    Tan, Qiao-feng
    Wang, Xu
    Liu, Pan
    Lei, Xiao-hui
    Cai, Si-yu
    Wang, Hao
    Ji, Yi
    WATER RESOURCES MANAGEMENT, 2017, 31 (01) : 143 - 158
  • [32] RISK DECISION ANALYSIS OF FLOODWATER RESOURCE UTILIZATION BASED ON ADJUSTING FLOOD LIMITED WATER LEVEL OF RESERVOIR
    Fang, Guohua
    Yang, Yong
    Yuan, Yu
    Huang, Xianfeng
    Wen, Xin
    FRESENIUS ENVIRONMENTAL BULLETIN, 2017, 26 (10): : 5745 - 5753
  • [33] Risk level analysis on the flood control capacity of river levee
    Li, TL
    Chao, LZ
    ADVANCES IN HYDRAULICS AND WATER ENGINEERING, VOLS 1 AND 2, PROCEEDINGS, 2002, : 651 - 655
  • [34] Risk analysis of flood control reservoir operation considering multiple uncertainties
    Huang, Kangdi
    Ye, Lei
    Chen, Lu
    Wang, Quansen
    Dai, Ling
    Zhou, Jianzhong
    Singh, Vijay P.
    Huang, Mutao
    Zhang, Junhong
    JOURNAL OF HYDROLOGY, 2018, 565 : 672 - 684
  • [35] Risk Analysis for Real-Time Flood Control Operation of a Reservoir
    Chen, Juan
    Zhong, Ping-an
    Xu, Bin
    Zhao, Yun-fa
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2015, 141 (08)
  • [36] Dynamic control bound of flood limited water level considering capacity compensation regulation and design flood uncertainty of cascade reservoirs
    Tan Q.
    Lei X.
    Wang H.
    Wang X.
    Wang, Xu (1554583613@qq.com), 2017, Sichuan University (49): : 60 - 69
  • [37] Perspectives on risk analysis and control for real-time operation of flood control systems
    Chen, Juan
    Zhang, Lu
    Li, Guo-zhi
    Zhong, Ping-an
    WATER SCIENCE AND ENGINEERING, 2024, 17 (04) : 319 - 322
  • [38] Optimal operation of a reservoir for flood control and recharging groundwater and its risk analysis
    Zheng, DF
    Wang, BD
    Dong, SH
    PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON RIVER SEDIMENTATION, VOLS 1-4, 2004, : 997 - 1002
  • [39] Risk analysis on flood control operation of reservoir based on stochastic hydrological process
    Dalian University of Technology, Dalian 116024, China
    不详
    Shuili Xuebao, 2006, 2 (227-232):
  • [40] Credibility theory based dynamic control bound optimization for reservoir flood limited water level
    Jiang, Zhiqiang
    Sun, Ping
    Ji, Changming
    Zhou, Jianzhong
    JOURNAL OF HYDROLOGY, 2015, 529 : 928 - 939