Fast-track construction for concrete pavement rehabilitation - California urban highway network

被引:0
|
作者
Lee, Eul-Bum
Choi, Kunhee
机构
[1] Univ Calif Berkeley, Pavement Res Ctr, Inst Transportat Studies, Richmond, CA 94804 USA
[2] Univ Calif Berkeley, Dept Civil & Environm Engn, Berkeley, CA 94720 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This case study presents an innovative fast-track reconstruction approach applied to a heavily trafficked Long-Life (30-plus years) Pavement Rehabilitation Strategies (LLPRS) project on 1-15 in Devore in Southern California. A 4.5-km stretch of badly damaged concrete truck lanes was rebuilt over two 215-h (approximately 9-day) periods with one-roadbed full closures with counterflow traffic and around-the-clock (24 h per day/ 7 days per week) construction operations. The same project would have taken 10 months to complete with traditional nighttime closures. State-of-practice technologies were adopted on this Rapid Rehab project to accelerate construction, mitigate traffic disruptions, and propagate project information. From the initial planning and design stages, engineers used CA4PRS (Construction Analysis for Pavement Rehabilitation Strategies) software incorporated with traffic simulation models to develop an optimal and economical rehabilitation scenario. Post-construction data validated the preconstruction analysis and simulation estimates of productivity and traffic delays. Because of the implementation of an Automated Work Zone Information System and proactive public outreach, a 20% reduction in traffic demand through the construction work zone was achieved and thereby reduced the maximum peak hour delay to a "tolerable" level. Surveys on the project website showed dramatic changes in public perception of the Rapid Rehab extended closures approach from initial reluctance and objection to positive support. Advantages of using this method of fast-track accelerated highway reconstruction included less traffic disruption for the traveling public, longer (more than 30 years) pavement life expectancy, improved safety for motorists and workers, and reduced agency cost compared with the traditional approach using repeated nighttime closures.
引用
下载
收藏
页码:3 / 10
页数:8
相关论文
共 50 条
  • [1] Fast-track rehabilitation of aged concrete pavement with new concrete
    Anon
    Indian Concrete Journal, 2002, 76 (04): : 203 - 204
  • [2] Fast-track construction for precast concrete
    Jones, Paul
    Concrete (London), 2003, 37 (11): : 14 - 15
  • [3] Prediction of early-age strength development of ultra fast-track concrete for pavement rehabilitation
    Anckaert, B.
    Vandewalle, L.
    Beeldens, A.
    Rens, L.
    ADVANCED CHARACTERISATION OF PAVEMENT SOIL ENGINEERING MATERIALS, VOLS 1 AND 2, 2007, : 1525 - 1533
  • [4] Documenting fast-track construction
    Brown, Linda
    Construction Specifier, 2003, 56 (03): : 104 - 106
  • [5] Fast-track Rehabilitation after Oesophagectomy
    Schroeder, Wolfgang
    Mallmann, Christoph
    Babic, Benjamin
    Bruns, Christiane
    Fuchs, Hans Friedrich
    ZENTRALBLATT FUR CHIRURGIE, 2021, 146 (03): : 306 - 314
  • [6] Construction productivity and constraints for concrete pavement rehabilitation in urban corridors
    Lee, EB
    Ibbs, CW
    Harvey, JT
    Roesler, JR
    CONSTRUCTION 2000: MATERIALS AND CONSTRUCTION, 2000, (1712): : 13 - 22
  • [7] Construction productivity and constraints for concrete pavement rehabilitation in urban corridors
    Lee, E.-B.
    Ibbs, C.W.
    Harvey, J.T.
    Roesler, J.R.
    Transportation Research Record, 2000, (1712) : 13 - 24
  • [8] FAST-TRACK CONCRETE PAVING.
    Pearson, Robert I.
    Concrete International, 1988, 10 (08) : 33 - 35
  • [9] Fast-track concrete block paving
    Alcock, Michael
    Walsh, Noel
    Concrete (London), 2000, 34 (08):
  • [10] Design impact of construction fast-track
    Fazio, P.
    Moselhi, O.
    Théberge, P.
    Revay, S.
    Construction Management and Economics, 1988, 6 (03) : 195 - 208