共 49 条
- [45] Dynamic job shop scheduling using a neural network: 1st report, a two-stage training method to minimize tardiness cost Nippon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C, 2002, 68 (08): : 2494 - 2501
- [47] Active site-directed inhibition by optically pure epoxyalkyl cellobiosides reveals differences in active site geometry of two 1,3-1,4-β-D-glucan 4-glucanohydrolases: The Importance of epoxide stereochemistry for enzyme inactivation 1600, American Society for Biochemistry and Molecular Biology Inc., Bethesda, United States (266):
- [49] Establishment of VCA and EBNA1 IgA-based combination by enzyme-linked immunosorbent assay as preferred screening method for nasopharyngeal carcinoma: a two-stage design with a preliminary performance study and a mass screening in southern China INTERNATIONAL JOURNAL OF CANCER, 2012, 131 (02) : 406 - 416