STRESS EVALUATION METHOD OF BAFFLE FORMER BOLT AND ITS MAINTENANCE PROGRAM

被引:0
|
作者
Matsubara, Toru [1 ]
Mogami, Yuichi [1 ]
机构
[1] Mitsubishi Heavy Ind Co Ltd, Tokyo, Japan
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Baffle Former Bolt (BFB) is a fastening part of Reactor Vessel Internals (RVI) of PWR. BFB is made of type 347 or 316CW (cold work) stainless steel and it is known to have the risk of cracking caused by Irradiation Assisted Stress Corrosion Cracking (IASCC) under high neutron flux and tensile stress. To evaluate the time to crack of BFB, BFB's time-dependent stress change caused by irradiation creep (relaxation) and by the swelling deformation of a baffle structure should be obtained. The authors have developed the finite element (FE) analysis method to calculate time-dependent stress of BFB considering the irradiation effects. The method combines two kinds of models; "global model" to calculate the deformation of whole baffle structure and "local model" to calculate the peak stress at the stress concentrated area under the bolt head. Incorporating the above calculation method, a new BFB inspection and evaluation guideline has been established in Japan. The concept of the guideline is also outlined in the paper.
引用
收藏
页数:10
相关论文
共 50 条
  • [41] Methadone maintenance in prison: Evaluation of a pilot program in Puerto Rico
    Heimer, Robert
    Catania, Holly
    Newman, Robert G.
    Zambrano, John
    Brunet, Arlyn
    Ortiz, Arturo Marti
    DRUG AND ALCOHOL DEPENDENCE, 2006, 83 (02) : 122 - 129
  • [42] A five year evaluation of a methadone medical maintenance program.
    Harris, KA
    Amsten, JH
    Hecht, J
    Joseph, H
    Marion, I
    Juliana, P
    Gourevitch, MN
    JOURNAL OF GENERAL INTERNAL MEDICINE, 2005, 20 : 170 - 170
  • [43] Evaluation program as a driving force for efficient operation and maintenance of waterworks
    Choi, S
    Yoon, JY
    Hong, SK
    Efficient Use and Management of Urban Water Supply (Efficient 2005), 2005, 5 (3-4): : 115 - 120
  • [44] Implementation and Maintenance Evaluation of the School Oral Health Program in Kuwait
    Alsumait, Aishah
    Amin, Maryam
    Raine, Kim
    Rgokiert, Rebecca
    INTERNATIONAL JOURNAL OF QUALITATIVE METHODS, 2018, 17 (01): : 1 - 1
  • [45] Psychological stress and its relationship to telomere length maintenance
    Lin, Jue
    Puterman, Eli
    O'Donovan, Aoife
    Krauss, Jeff
    Lazaro, Alanie
    Wanda Truong
    Cheon, Joshua
    Epel, Elissa
    Blackburn, Elizabeth H.
    CANCER RESEARCH, 2011, 71
  • [46] Development of a Method for the Economic Evaluation of Predictive Maintenance
    Tauterat, Tobias
    SOFTWARE BUSINESS, ICSOB 2015, 2015, 210 : 179 - 185
  • [47] EXPERIMENTAL EVALUATION OF A METHOD FOR SIMPLIFYING ELECTRONIC MAINTENANCE
    ELLIOTT, TK
    JOYCE, RP
    HUMAN FACTORS, 1971, 13 (03) : 217 - &
  • [48] CLAS - A PROGRAM FOR CLASSIFICATION AND ITS EVALUATION
    HEMEL, JB
    VANDERVOET, H
    TRAC-TRENDS IN ANALYTICAL CHEMISTRY, 1986, 5 (09) : 224 - 225
  • [49] Analysis of bolt preload mistuned model and its impact on stress distribution of curvic couplings
    Yuan, Shuxia
    Zhang, Youyun
    Jiang, Xiangjun
    Zhu, Yongsheng
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2013, 45 (05): : 64 - 69
  • [50] Correction of coupling error in contact-type ultrasonic evaluation of bolt axial stress
    He Xingliang
    Duan Yixiang
    Fan Qingwen
    Lin Qingyu
    Chen Ping
    Ye Xia
    Zeng Lingwei
    Rao Yu
    Wu Mengfan
    ULTRASONICS, 2022, 124