An Equivalent Method for Fuzzy Reliability Analysis

被引:0
|
作者
Zhang, Xiaoqiang [1 ]
Gao, Huiying [2 ]
Huang, Hong-Zhong [1 ]
Behera, Diptiranjan [1 ]
机构
[1] Univ Elect Sci & Technol China, Ctr Syst Reliabil & Safety, 2006 Xiyuan Ave, Chengdu 611731, Sichuan, Peoples R China
[2] Xihua Univ, Sch Automobile & Transportat, 999 Jinzhou Rd, Chengdu 610039, Sichuan, Peoples R China
关键词
fuzzy variable; normal random variable; equivalent transformation; fuzzy reliability analysis; lambda-level cutting; EPISTEMIC UNCERTAINTY; INTERVAL NUMBER;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Traditional structural reliability analysis reveals that the structure is safe if the stress is less than the strength, otherwise the structure fails. However there is a doubt what will happen if the stress is slightly less or more than the strength. Additionally, the situation will be more complex if the failure threshold is also uncertain with respect to time. In this regard, fuzzy reliability theory has been developed and using lambda-level cutting method can deal with this problem well. But sometimes it is computationally expensive. So this paper proposed a novel reliability analysis method based on the concept of entropy to calculate the fuzzy reliability. By means of the invariance of entropy, that is, fuzzy entropy of the original fuzzy variable equals to probabilistic entropy of the equivalent random variable, fuzzy variable can be transformed into normal random variable. Accordingly, fuzzy reliability analysis is turned into classical reliability analysis, and the well-established theories of probability can be used to calculate the structural reliability. The rationality of the equivalent transformation is also proved in this paper. The proposed method is not only applicable to normal membership function but applicable to any other type of membership functions as well. Two example problems are analyzed to illustrate the applicability of the proposed method. Also -level cutting method is used for comparison. From the obtained results it can be concluded that the proposed method owns higher efficiency with almost the same accuracy.
引用
收藏
页数:4
相关论文
共 50 条
  • [31] A novel evidence-based fuzzy reliability analysis method for structures
    Y. R. Tao
    L. Cao
    Z. H. H. Huang
    Structural and Multidisciplinary Optimization, 2017, 55 : 1237 - 1249
  • [32] Fuzzy reliability analysis of a system by fuzzy number
    Jiguo, Zhang
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering & Electronics, 1994, 16 (09):
  • [33] Damage equivalent method of fatigue reliability analysis of load-sharing parallel system
    Hao, G. B.
    Xie, L. Y.
    MATERIALS AND PRODUCT TECHNOLOGIES, 2008, 44-46 : 853 - 858
  • [34] FUZZY RELIABILITY ANALYSIS OF STRUCTURE
    黄洪钟
    须雷
    胡宗武
    Journal of Shanghai Jiaotong University, 1999, (01) : 77 - 80
  • [35] Advanced equivalent plane method for structural system reliability
    Chen, Weidong
    Li, Jiancao
    Lixue Xuebao/Chinese Journal of Theoretical and Applied Mechanics, 2012, 44 (04): : 797 - 801
  • [36] A Simplified Equivalent Method of Wind Farm for Reliability Evaluation
    Zhang, Zece
    Wang, Xiuli
    Wu, Zechen
    Shen, Tianshi
    2016 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2016, : 1250 - 1253
  • [37] Improved equivalent plane method in system reliability computation
    Kang, Hai-Gui
    Zhang, Jing
    Zhang, Xiao-Qing
    Jisuan Lixue Xuebao/Chinese Journal of Computational Mechanics, 2010, 27 (01): : 139 - 144
  • [38] Analysis of component reliability based on equivalent load
    Gao, Peng
    Xie, Li-Yang
    Binggong Xuebao/Acta Armamentarii, 2010, 31 (05): : 641 - 645
  • [39] Interval optimization based line sampling method for fuzzy and random reliability analysis
    Li, Luyi
    Lu, Zhenzhou
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (13) : 3124 - 3135
  • [40] Time history analysis method for dynamic fuzzy reliability of bedding rock slope
    Zhong, X. H.
    Gong, W. H.
    Chen, X. L.
    Qiu, J. W.
    Li, Y.
    ROCK DYNAMICS: FROM RESEARCH TO ENGINEERING, 2016, : 529 - 540