Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem

被引:36
|
作者
Dang Cong Hop [1 ]
Nguyen Van Hop [1 ]
Truong Tran Mai Anh [1 ]
机构
[1] Int Univ, VNU HCMC, Sch Ind Engn & Management, Quarter 6, Ho Chi Minh City, Vietnam
关键词
Quay crane; Yard truck; Scheduling; Particle Swarm Optimization (PSO); DISPATCHING METHOD; ALGORITHM; ASSIGNMENT; VEHICLES; BRANCH; BERTH;
D O I
10.1016/j.cie.2020.107075
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study takes into account the integrated quay crane and yard truck scheduling problem in which the yard truck picks containers at quay crane and then transports required containers to the container yard then return to the quay crane without carrying exported containers. A new mixed - integer programming model is formulated to capture two more conditions on the number of containers to be handled by quay crane and yard truck at a time. The objective is to minimize total time to complete the unloading and transporting operations for all required containers. Moreover, an Adaptive Particle Swarm Optimization (APSO) algorithm with all automatically adjusted parameters of inertia weight, cognitive coefficient and social coefficient is developed to search for better solutions. The proposed APSO gives closed optimal solutions obtained from the mixed - integer program. It also gives better performance than similar metaheuristic approaches such as Fixed Particle Swarm Optimization (FPSO) and Grey Wolf Optimization (GWO) for large sized problems in reasonable time.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] THE INTEGRATED SCHEDULING OF QUAY CRANE AND YARD TRUCK
    Ting, Shang Xiao
    Xin, Cao Jin
    Bin, Jia
    [J]. 2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 2271 - 2277
  • [2] Particle Swarm Optimization for Integrated Yard Truck Scheduling and Storage Allocation Problem
    Niu, B.
    Xie, T.
    Duan, Q. Q.
    Tan, L. J.
    [J]. 2014 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2014, : 634 - 639
  • [3] Integrated quay crane and yard truck scheduling problem at port of Tripoli-Lebanon
    Skaf, Ali
    Lamrous, Sid
    Hammoudan, Zakaria
    Manier, Marie-Ange
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 159
  • [4] Integrated quay crane and yard truck scheduling for unloading inbound containers
    Kaveshgar, Narges
    Nathan Huynh
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 159 : 168 - 177
  • [5] Integrated Quay Crane and Yard Truck Schedule Problem in Container Terminals
    曹瑾鑫
    史其信
    Der-Horng Lee
    [J]. Tsinghua Science and Technology, 2010, 15 (04) : 467 - 474
  • [6] A particle swarm optimization for the quay crane scheduling problem with non-interference constraints
    Zhao, Jiao
    Tang, Lixin
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 270 - 272
  • [7] Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption
    He, Junliang
    Huan, Youfang
    Yan, Wei
    Wang, Shuaian
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (05) : 2464 - 2487
  • [8] Heuristic/Metaheuristic-Based Simulation Optimization Approaches for Integrated Scheduling of Yard Crane, Yard Truck, and Quay Crane Considering Import and Export Containers
    HSU, HSIEN-PIN
    CHOU, CHIEN-CHANG
    WANG, CHIA-NAN
    [J]. IEEE ACCESS, 2022, 10 : 64650 - 64670
  • [9] Heuristic/Metaheuristic-Based Simulation Optimization Approaches for Integrated Scheduling of Yard Crane, Yard Truck, and Quay Crane Considering Import and Export Containers
    Hsu, Hsien-Pin
    Chou, Chien-Chang
    Wang, Chia-Nan
    [J]. IEEE Access, 2022, 10
  • [10] Integrated Quay Crane and Yard Truck Schedule for Inbound Containers
    Lee, Der-Horng
    Cao, Jin Xin
    Shi, Qi Xin
    [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1219 - +