Development and validation of the new ALSTOM GT24/GT26 upgrade compressor

被引:0
|
作者
Koerbaecher, Heiko [1 ]
Pfeiffer, Andreas [1 ]
Rothe, Thomas [1 ]
机构
[1] Aistom Ltd, Baden, Switzerland
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Since 1996 more than 75 ALSTOM GT24/GT26 heavy-duty gas turbines have been installed worldwide for the 50 Hz and 60 Hz market. The GT24/GT26 features a unique advanced sequential combustion system, a one stage high-pressure turbine and a 4-stage low-pressure turbine. The 22-stage compressor delivers a pressure ratio of 32:1. Typical power output is up to 281MW (GT24: 188MW) in single-cycle (with quench cooler) and more than 400MW in combined cycle operation (CCPP). In 2001, ALSTOM launched a performance improvement and upgrade program for these heavy-duty gas turbines after experiencing some problems with the advanced technology. Several upgrade packages were rolled out into the field after extensive testing at the Birr Test Center; Switzerland. A new GT24/GT26B-compressor is part of the upgrade and retrofit packages that were developed. These were extensively tested and validated during several test campaigns at the Test Centre in 2002. The GT24 compressor is a scaled version of the GT26 compressor. The compressor tests were completed in 2002 and since then fifteen engines have received the compressor upgrade and further installations are planned. This paper gives an overview of the compressor development, validation and the impact on the gas turbine performance of the GT24/GT26 upgrade compressor.
引用
收藏
页码:317 / 325
页数:9
相关论文
共 50 条
  • [43] Experience Gained from Construction of Low-Emission Combustion Chambers for On-Land Large-Capacity Gas-Turbine Units: GT24/26
    Bulysova L.A.
    Vasil’ev V.D.
    Berne A.L.
    Gutnik M.M.
    [J]. Thermal Engineering, 2018, 65 (06) : 362 - 370
  • [44] REDUCTION OF NOX EMISSIONS IN ALSTOM GT11NM ENGINES: DEVELOPMENT, VALIDATION AND ENGINE OPERATION EXPERIENCE OF THE EV-ALPHA BURNER
    Magni, Fulvio
    Hudgins, Duane
    Geng, Weiqun
    Grimm, Frank
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO 2012, VOL 2, PTS A AND B, 2012, : 255 - +
  • [45] IPP的升级改进将给4个GT24联合循环电站提供更多尖峰容量
    吉桂明
    [J]. 热能动力工程, 2016, 31 (12) : 102 - 102
  • [46] Revision of the Dissolution Procedure: Development and Validation <1092>
    Skwierczynski, R.
    Curry, P.
    Gray, V.
    Kraemer, J.
    Stippler, E.
    Suggett, J.
    Mirza, T.
    Brown, W.
    [J]. DISSOLUTION TECHNOLOGIES, 2014, 21 (01): : 6 - 8
  • [47] GT36 TURBINE AERO-THERMAL DEVELOPMENT AND VALIDATION
    Naik, S.
    Krueckels, J.
    Henze, M.
    Hofmann, W.
    Schnieder, M.
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2017, VOL 3, 2017,
  • [48] GT36 TURBINE DEVELOPMENT AND FULL-SCALE VALIDATION
    Naik, S.
    Stephan, B.
    Henze, M.
    [J]. PROCEEDINGS OF ASME TURBO EXPO 2021: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, VOL 4, 2021,
  • [49] AN INTRODUCTION INTO THE CLEARANCE MANAGEMENT OF ANSALDO GT36 FROM DEVELOPMENT TO VALIDATION
    Boeller, S.
    Feuillard, B.
    Filkorn, G.
    Olmes, S.
    Prou, F.
    Robson, C.
    Santos, R.
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, 2018, VOL 3, 2018,
  • [50] Development and validation of a GT-seq panel for genetic monitoring in a threatened species using minimally invasive sampling
    Garrett, Molly J.
    Nerkowski, Stacey A.
    Kieran, Shannon
    Campbell, Nathan R.
    Barbosa, Soraia
    Conway, Courtney J.
    Hohenlohe, Paul A.
    Waits, Lisette P.
    [J]. ECOLOGY AND EVOLUTION, 2024, 14 (05):