共 50 条
- [31] An Integrated Inventory Problem with Transportation in a Single-vendor Multiple-buyer Supply Chain Coordination with Stochastic Demand [J]. 2021 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM21), 2021, : 177 - 184
- [32] Energy Implications in the Single-Vendor Single-Buyer Integrated Production Inventory Model [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: COMPETITIVE MANUFACTURING FOR INNOVATIVE PRODUCTS AND SERVICES, AMPS 2012, PT I, 2013, 397 : 57 - 64
- [34] A vendor-buyer stochastic inventory model with lead time reduction in supply chain [J]. PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 2542 - +
- [39] An integrated production-inventory model for the single-vendor two-buyer problem with partial backorder, stochastic demand, and service level constraints [J]. 2015 INTERNATIONAL CONFERENCE ON MATHEMATICS, ITS APPLICATIONS, AND MATHEMATICS EDUCATION (ICMAME 2015), 2016, 693