New downhole tool extends coiled-tubing reach

被引:2
|
作者
不详
机构
来源
JOURNAL OF PETROLEUM TECHNOLOGY | 2000年 / 52卷 / 06期
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Extending reach is one of the main challenges for coiled-tubing (CT) operators, as illustrated by the development of downhole traction devices for CT. A tool called the CT friction/drag reducer (FDR) is based on a unique patented concept and uses fluid flow to generate axial oscillations in the CT and bottom-hole assembly (BHA) to reduce time-averaged frictional forces significantly. Calculations based on a simple physics-based model predict that reach can be extended by more than 3000 m in a horizontal well,vith a measured-depth (MD) -to-true-vertical-depth (TVD) ratio (MD/TVD) greater than 2.0. Model results march full-scale tests well. The FDR tool was developed and tested as part of a joint industry project (JIP), Full-scale tests with a 7-in.-internal diameter horizontal surface loop have proved the friction-reducing efficiency of the concept. In several tests with 600 m of 13/4-in. CT and a BHA weighing 600 kg, the frictional force during run-in and pullout was reduced by as much as 90%.
引用
收藏
页码:32 / +
页数:2
相关论文
共 50 条
  • [21] Coiled-tubing operations from a vessel
    不详
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1998, 50 (06): : 53 - +
  • [22] Electric coiled-tubing drilling
    不详
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1998, 50 (09): : 68 - 69
  • [23] Challenge for the coiled-tubing industry
    [J]. Blount, C.G., 1600, (46):
  • [24] FURTHER ADVANCES IN COILED-TUBING DRILLING
    EIDE, E
    BRINKHORST, J
    VOLKER, H
    BURGE, P
    EWEN, R
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1995, 47 (05): : 403 - 408
  • [25] Further advances in coiled-tubing drilling
    Erdgas & Erdol GmbH
    [J]. JPT J Pet Technol, 5 (403-408):
  • [26] Coiled-tubing fracturing in the Appalachian basin
    Bybee, K
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 2002, 54 (07): : 45 - 45
  • [27] Advances in coiled-tubing operating systems
    SasJaworsky, A
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1997, 49 (06): : 584 - 585
  • [28] Sidetracking technology for coiled-tubing drilling
    Leising, LJ
    Hearn, DD
    Rike, EA
    Doremus, DM
    Paslay, PR
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1996, 48 (05): : 414 - +
  • [29] Coiled-tubing underbalanced through-tubing drilling
    不详
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 2004, 56 (06): : 49 - 50
  • [30] Advances in coiled-tubing operating systems
    SAS Industries, Houston, United States
    [J]. JPT J Pet Technol, 6 (584-585):