共 50 条
- [3] Optimization of multi-stage production planning in ERW pipe manufacturing [J]. Beijing Keji Daxue Xuebao, 2006, 7 (691-695):
- [5] Manufacturing capacity planning and the value of multi-stage stochastic programming under Markovian demand [J]. Flexible Services and Manufacturing Journal, 2010, 22 : 143 - 162
- [7] Preventive Maintenance Strategy for Multi-Stage Flexible Manufacturing System with Dynamic Production Planning [J]. Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2020, 54 (11): : 1124 - 1133