Preventive Maintenance Strategy for Multi-Stage Flexible Manufacturing System with Dynamic Production Planning

被引:0
|
作者
Zhu, Mixin [1 ]
Ge, Yaxiong [1 ]
Zhou, Xiaojun [1 ]
机构
[1] School of Mechanical Engineering, Shanghai Jiao Tong University, Shanghai,200240, China
关键词
Flexible manufacturing systems - Planning - Hazards - Loading - Production control - Costs;
D O I
10.16183/j.cnki.jsjtu.2019.165
中图分类号
学科分类号
摘要
This paper focused on multi-stage flexible manufacturing systems working in variable loading conditions. Based on the proportional hazards model, a load-dependent degradation model is proposed for components operating in the variable loading condition. Besides, a modified machine-selecting and load-sharing model, considering the virtual age of components and capacity requirement, is proposed to quantify the load condition of components. Moreover, taking degradation of components into account, a hybrid imperfect maintenance model is developed, which is followed by the final objective to determine the best maintenance strategy to minimize the expected maintenance costs of system in the dynamic production planning phase. Furthermore, a greedy algorithm with constraint on preventive maintenance time of system is proposed to solve the problem. The illustrative example shows that this model can dynamically respond to variable system maintenance requirements under the flexible operation condition. It outperforms the full loading model and the expected loading model in cost rate. © 2020, Shanghai Jiao Tong University Press. All right reserved.
引用
收藏
页码:1124 / 1133
相关论文
共 50 条
  • [1] Production capacity planning and control in multi-stage manufacturing
    Gunasekaran, A
    Goyal, SK
    Martikainen, T
    Yli-Olli, P
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (06) : 625 - 634
  • [2] An Approximation Approach for an Integrated Part Quality Inspection and Preventive Maintenance Planning in a Nonlinear Deteriorating Serial Multi-stage Manufacturing System
    Rezaei-Malek, M.
    Siadat, A.
    Dantan, J. -Y.
    Tavakkoli-Moghaddam, R.
    [J]. IFAC PAPERSONLINE, 2018, 51 (11): : 270 - 275
  • [3] A note on production capacity planning and control in multi-stage manufacturing
    Sarker, RA
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2000, 51 (05) : 639 - 640
  • [4] A novel model for the integrated planning of part quality inspection and preventive maintenance in a linear-deteriorating serial multi-stage manufacturing system
    Rezaei-Malek, M.
    Tavakkoli-Moghaddam, R.
    Siadat, A.
    Dantan, J. -Y.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 96 (9-12): : 3633 - 3650
  • [6] A novel model for the integrated planning of part quality inspection and preventive maintenance in a linear-deteriorating serial multi-stage manufacturing system
    M. Rezaei-Malek
    R. Tavakkoli-Moghaddam
    A. Siadat
    J.-Y. Dantan
    [J]. The International Journal of Advanced Manufacturing Technology, 2018, 96 : 3633 - 3650
  • [7] Optimizing Maintenance Strategy of Multi-stage Production System Based on Genetic Algorithm and Configuration
    Xie, Nan
    Wiederhold, Martin
    Zheng, Beirong
    Xue, Wei
    Dittrich, Peter
    [J]. MACHINE DESIGN AND MANUFACTURING ENGINEERING II, PTS 1 AND 2, 2013, 365-366 : 576 - +
  • [8] Influence of maintenance policies on multi-stage manufacturing systems in dynamic conditions
    Renna, Paolo
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (02) : 345 - 357
  • [9] Impact of Preventive Maintenance on the Service Level of Multi-stage Manufacturing Systems with Degrading Machines
    Angius, Alessio
    Colledani, Marcello
    Silipo, Laura
    Yemane, Anteneh
    [J]. IFAC PAPERSONLINE, 2016, 49 (12): : 568 - 573
  • [10] Dynamic preventive maintenance strategy for an aging and deteriorating production system
    Chen, Chin-Tai
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (05) : 6287 - 6293