An Indian case study of Power System Network Planning proposed on Tellegen's theorem

被引:0
|
作者
Soonee, S. K. [1 ]
Baba, K. V. S. [2 ]
Narasimhan, S. R. [1 ]
Porwal, R. K. [1 ]
Jain, Suruchi [2 ]
Reddy, Pradeep [2 ]
机构
[1] IEEE, Piscataway, NJ USA
[2] POSOCO, New Delhi, India
关键词
Computational Techniques; Network Theory; Network Planning; Power System Planning Challenges; Tellegen Theorem;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Power System planning at large, comprises of load forecasting, Generation expansion/retirements, Transmission planning, expansion/augmentation in view of future power supply scenarios. The power system planning approach/methodology at large depends on first move of either generator or transmission planner. It requires co-ordination between generator and transmission planner and if a centralized planning regime exists, then the outcome is theoretically expected to be more efficient. With generation under competition and a delicensed activity coupled with electricity markets, transmission system planning faces further challenges. The heuristic/iterative methods seem to be efficient for small and growing system. At present, power system size has been increasing enormously and it is still growing. Effective and efficient planning in such a big complex system inevitably requires automation techniques. Various computation technique or algorithm are being explored i.e., Graph/Network theory, in power system applications or for populating the best possible combination for planning of transmission lines. This paper is presenting an Indian case study of Northern Region power system planning applying the principle of Tellegen's theorem. The suitable candidates for transmission line based on short length and optimal power flow are proposed. These best possible combinations of lines can be optimized further depending on planner requirement with other methodologies.
引用
收藏
页数:6
相关论文
共 50 条
  • [41] Dini's Theorem: A constructive case study
    Bridges, DS
    COMBINATORICS, COMPUTABILITY AND LOGIC, 2001, : 69 - 80
  • [42] CORPORATE-PLANNING IN DOMESTIC AIRLINES - INDIAN CASE STUDY
    SUBRAMANIAM, S
    SHARMA, CK
    LONG RANGE PLANNING, 1975, 8 (04) : 64 - 69
  • [43] Application of Differential Evolution for Irrigation Planning: An Indian Case Study
    A. Vasan
    Komaragiri Srinivasa Raju
    Water Resources Management, 2007, 21 : 1393 - 1407
  • [44] Application of differential evolution for irrigation planning: An Indian case study
    Vasan, A.
    Raju, Komaragiri Srinivasa
    WATER RESOURCES MANAGEMENT, 2007, 21 (08) : 1393 - 1407
  • [45] CORPORATE-PLANNING IN INDIAN RAILWAYS - CASE-STUDY
    SUBRAMANIAM, S
    LONG RANGE PLANNING, 1979, 12 (03) : 91 - &
  • [46] Biodiversity as part of urban green network system planning case study: Pontianak City
    Ratih, Yudithya
    Febrianto, Jockie Zudhi
    CITIES 2015: INTELLIGENT PLANNING TOWARDS SMART CITIES, 2016, 227 : 583 - 586
  • [47] The DC power planning for network flexibility in the multi-area power system
    Michi, L.
    Donnini, G.
    Aluisio, B.
    Migliori, M.
    Vergine, C.
    Dicorato, M.
    Forte, G.
    2019 AEIT INTERNATIONAL ANNUAL CONFERENCE (AEIT), 111TH EDITION, 2019,
  • [48] Synthetic Distribution Grid Generation Using Power System Planning: Case Study of Singapore
    Trpovski, Andrej
    Recalde, Dante
    Hamacher, Thomas
    2018 53RD INTERNATIONAL UNIVERSITIES POWER ENGINEERING CONFERENCE (UPEC), 2018,
  • [49] THE ECONOMICS OF POWER SYSTEM RELIABILITY AND PLANNING - THEORY AND CASE-STUDY - MUNASINGHE,M
    SANGHVI, AP
    JOURNAL OF ENERGY AND DEVELOPMENT, 1982, 7 (02): : 336 - 339