Developing a generic risk maturity model (GRMM) for evaluating risk management in construction projects

被引:26
|
作者
Hoseini, Erfan [1 ]
Hertogh, Marcel [1 ]
Bosch-Rekveldt, Marian [1 ]
机构
[1] Delft Univ Technol, Fac Civil Engn & Geosci, Stevinweg 1, NL-2628 CN Delft, Netherlands
关键词
Project risk management; risk maturity model; evaluation of risk management; threat and opportunity; construction management; CAPABILITY; SCALE;
D O I
10.1080/13669877.2019.1646309
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
The literature on risk management acknowledges a growing number of Risk Maturity Models (RMM). However, for the construction sector, there is no validated RMM that is based on both theory and experts' opinions. In this article, a Generic RMM (GRMM), inspired by the EFQM model, is developed and validated to remedy this shortcoming. The GRMM uses a list of statements extracted from risk management literature by means of qualitative content analysis. The statements and the model are both validated by means of two focus group sessions, based on which the statements and the model are improved. According to the experts, the GRMM is easy to use and provides projects with a clear picture of potential improvements regarding risk management. Project managers can use the GRMM for planning and improving risk management, as well as for cross-project analysis for learning purposes. Further research on application of the GRMM in real projects is recommended.
引用
收藏
页码:889 / 908
页数:20
相关论文
共 50 条
  • [1] GUIDELINES TO RISK MANAGEMENT MATURITY IN CONSTRUCTION PROJECTS
    Gusmao Caiado, Rodrigo Goyannes
    Alves Lima, Gilson Brito
    de Mattos Nascimento, Daniel Luiz
    Neto, Julio Vieira
    Maultasch de Oliveira, Rodolpho Augusto
    [J]. BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2016, 13 (03) : 372 - 385
  • [2] Developing a Value-Risk Management Model for Construction Projects
    Leung, Mei-yung
    Wei, Xiaoyi
    Ojo, Lekan Damilola
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (01)
  • [3] Developing Fuzzy Enterprise Risk Management Maturity Model for Construction Firms
    Zhao, Xianbo
    Hwang, Bon-Gang
    Low, Sui Pheng
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (09) : 1179 - 1189
  • [4] A risk management model for construction projects
    Smit, S
    Al-Jibouri, S
    van den Adel, J
    [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2233 - 2238
  • [5] Developing a self-assessment model of risk management maturity for client organizations of public construction projects: Indonesian context
    Wibowo, Andreas
    Taufik, Januar
    [J]. 3RD INTERNATIONAL CONFERENCE ON SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONSTRUCTION MATERIALS - SUSTAINABLE STRUCTURES FOR FUTURE GENERATIONS, 2017, 171 : 274 - 281
  • [6] An Integrated Risk Management Model for Construction Projects
    Zhao, Zhen-Yu
    Duan, Lin-Ling
    [J]. 2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1389 - 1394
  • [7] Risk management system model for construction projects
    Titarenko, Boris
    Hasnaoui, Amir
    Titarenko, Roman
    [J]. XXI INTERNATIONAL SCIENTIFIC CONFERENCE ON ADVANCED IN CIVIL ENGINEERING CONSTRUCTION - THE FORMATION OF LIVING ENVIRONMENT (FORM 2018), 2018, 365
  • [8] Risk Management Application-Level Analysis in South Korea Construction Companies Using a Generic Risk Maturity Model
    Batagalle Vinuri Gimanthika Karunarathne
    Byung-Soo Kim
    [J]. KSCE Journal of Civil Engineering, 2021, 25 : 3235 - 3244
  • [9] Measuring the maturity of risk management in large-scale construction projects
    Jia, Guangshe
    Ni, Xiaochuan
    Chen, Zhen
    Hong, Baonan
    Chen, Yuting
    Yang, Fangjun
    Lin, Chen
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 34 : 56 - 66
  • [10] Assessment of Risk Management Maturity of Construction Organisations in Joint Venture Projects
    Abdulrahman, R.S.
    Ibrahim, A.D.
    Chindo, P.G.
    [J]. Journal of Engineering, Project, and Production Management, 2019, 9 (01) : 20 - 28