Developing Fuzzy Enterprise Risk Management Maturity Model for Construction Firms

被引:75
|
作者
Zhao, Xianbo [1 ]
Hwang, Bon-Gang [1 ]
Low, Sui Pheng [1 ]
机构
[1] Natl Univ Singapore, Dept Bldg, Singapore 117566, Singapore
关键词
Risk management; Construction companies; Fuzzy sets; Enterprise risk management; Construction firms; Fuzzy; Maturity; Best practices; Project planning and design;
D O I
10.1061/(ASCE)CO.1943-7862.0000712
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction firms have been seen as prime candidates for enterprise risk management (ERM) adoption. The ERM maturity assessment helps them to identify weak areas of their ERM implementation and to prioritize resources to improve these areas. The objectives of this paper are to identify the ERM best practices and important ERM maturity criteria in Chinese construction firms (CCFs) and to develop an ERM maturity model for CCFs. Through an in-depth literature review and a questionnaire survey conducted with 89 professionals, a total of 66 applicable ERM best practices and 16 important maturity criteria were identified and thus used in the proposed model. The results indicated that commitment of the board and senior management; risk identification, analysis, and response; and objective setting were the top three most important criteria. In addition, this model adopts the fuzzy set theory to quantify the implementation levels of the best practices. Moreover, this model was applied in a CCF based in Singapore and the output result was consistent with its current ERM practice. Although this paper focuses on CCFs, it helps other construction firms to prepare their customized model using the best practices and criteria identified in this paper, contributing to the global body of knowledge relating to ERM.
引用
收藏
页码:1179 / 1189
页数:11
相关论文
共 50 条
  • [1] Investigating Enterprise Risk Management Maturity in Construction Firms
    Zhao, Xianbo
    Hwang, Bon-Gang
    Low, Sui Pheng
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (08)
  • [2] A maturity model for enterprise risk management
    Oliva, Fabio Lotti
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 173 : 66 - 79
  • [3] Developing a Fuzzy Multi-Criteria Evaluation Model for Prefabrication Development Maturity of Construction Firms
    Dang, Pei
    Niu, Zhanwen
    Zhang, Guomin
    Gao, Shang
    Hou, Lei
    [J]. IEEE ACCESS, 2020, 8 : 222397 - 222409
  • [4] Developing a generic risk maturity model (GRMM) for evaluating risk management in construction projects
    Hoseini, Erfan
    Hertogh, Marcel
    Bosch-Rekveldt, Marian
    [J]. JOURNAL OF RISK RESEARCH, 2021, 24 (07) : 889 - 908
  • [5] Enterprise risk management in international construction firms: drivers and hindrances
    Zhao, Xianbo
    Hwang, Bon-Gang
    Low, Sui Pheng
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (03) : 347 - 366
  • [6] Barriers to the implementation of enterprise risk management in Indian construction firms
    Prakash, Anand
    Ambekar, Sudhir
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2024,
  • [7] Reducing Hindrances to Enterprise Risk Management Implementation in Construction Firms
    Zhao, Xianbo
    Hwang, Bon-Gang
    Low, Sui Pheng
    Wu, Peng
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (03)
  • [8] Drivers for and obstacles to enterprise risk management in construction firms: a literature review
    Renault, Berenger Y.
    Agumba, Justus N.
    Balogun, O. A.
    [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 402 - 408
  • [9] Enterprise risk management implementation in construction firms An organizational change perspective
    Zhao, Xianbo
    Hwang, Bon-Gang
    Low, Sui Pheng
    [J]. MANAGEMENT DECISION, 2014, 52 (05) : 814 - 833
  • [10] Project Management Maturity Models for Construction Firms
    Machado, Filipe
    Duarte, Nelson
    Amaral, Antonio
    Barros, Teresa
    [J]. JOURNAL OF RISK AND FINANCIAL MANAGEMENT, 2021, 14 (12)