共 23 条
- [1] Optimization of Cut-off Grades for Molybdenum and Tungsten Open-pit Mines [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON SUSTAINABLE DEVELOPMENT IN THE MINERALS INDUSTRY (SDIMI 2017), 2017, 2 : 18 - 23
- [2] The effect of price changes on optimum cut-off grade of different open-pit mines [J]. JOURNAL OF MINING AND ENVIRONMENT, 2012, 3 (01): : 61 - 68
- [3] Production Scheduling in Flexible Job Shop Scheduling Using an Imperialist Competitive Algorithm (ICA) Minimizing Makespan [J]. 2015 10TH COMPUTING COLOMBIAN CONFERENCE (10CCC), 2015, : 378 - 386
- [5] A new approach to constrained open pit pushback design using dynamic cut-off grades [J]. Journal of Mining Science, 2014, 50 : 733 - 744
- [8] An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage [J]. International Journal of Environmental Science & Technology, 2008, 5 : 183 - 194