Determination of the optimum cut-off grades and production scheduling in multi-product open pit mines using imperialist competitive algorithm (ICA)

被引:18
|
作者
Mohammadi, Sadjad [1 ]
Kakaie, Reza [1 ]
Ataei, Mohammad [1 ]
Pourzamani, Eshagh [2 ]
机构
[1] Shahrood Univ Technol, Fac Min Engn Petr & Geophys, Shahrood, Iran
[2] Golgohar Min & Ind Co, Bur Design Supervis, Sirjan, Iran
关键词
Open pit mines; Optimum cut-off grade; Production scheduling; Meta-heuristic algorithm; ICA; Golgohar iron mine; POLICY; MODEL;
D O I
10.1016/j.resourpol.2016.11.005
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With regard to the immense importance of cut-off grade in designing and planning open pit mines, optimizing this parameter has considerable effects in mining economic. This paper describes objective function for single metal mines with multi-product. For this purpose, the operation process in mine No.1 of the Golgohar iron mine that produces three types of products (sizing, concentrate and pellet) for sales is used to model objective function. Then the Imperialist Competitive Algorithm (ICA) has been utilized to find out the optimum cut-off grades. Consequently, the optimum cut-off grades has been calculated between 40.5 and 47.5% and net present value has been obtained 18,142 billion Rial. In addition, production scheduling is carried out for five years mining plan pushback. Therefore, the average stripping ratio has been determined 1.41. The result shows that by stockpiling low-grade ore, concentrate plant can be fed by maximum capacity for one year addition to the primary plan.
引用
收藏
页码:39 / 48
页数:10
相关论文
共 23 条
  • [1] Optimization of Cut-off Grades for Molybdenum and Tungsten Open-pit Mines
    Gu, Qinghua
    Yuan, Jin
    Lv, Yichuan
    Wu, Qiong
    Lu, Caiwu
    [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON SUSTAINABLE DEVELOPMENT IN THE MINERALS INDUSTRY (SDIMI 2017), 2017, 2 : 18 - 23
  • [2] The effect of price changes on optimum cut-off grade of different open-pit mines
    Khodayari, A. A.
    Jafarnejad, A.
    [J]. JOURNAL OF MINING AND ENVIRONMENT, 2012, 3 (01): : 61 - 68
  • [3] Production Scheduling in Flexible Job Shop Scheduling Using an Imperialist Competitive Algorithm (ICA) Minimizing Makespan
    Beltran Ricaurte, I. I. Brian
    Londono Restrepo, Maria Isabel
    [J]. 2015 10TH COMPUTING COLOMBIAN CONFERENCE (10CCC), 2015, : 378 - 386
  • [4] Optimum cut-off grade's calculation in open pit mines with regard to reducing the undesirable environmental impacts
    Narrei, S.
    Osanloo, M.
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2015, 29 (03) : 226 - 242
  • [5] A new approach to constrained open pit pushback design using dynamic cut-off grades
    C. Meagher
    R. Dimitrakopoulos
    V. Vidal
    [J]. Journal of Mining Science, 2014, 50 : 733 - 744
  • [6] A new approach to constrained open pit pushback design using dynamic cut-off grades
    Meagher, C.
    Dimitrakopoulos, R.
    Vidal, V.
    [J]. JOURNAL OF MINING SCIENCE, 2014, 50 (04) : 733 - 744
  • [7] Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation
    Paithankar, Amol
    Chatterjee, Snehamoy
    Goodfellow, Ryan
    Asad, Mohammad Waqar Ali
    [J]. RESOURCES POLICY, 2020, 66
  • [8] An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage
    F. Rashidinejad
    M. Osanloo
    B. Rezai
    [J]. International Journal of Environmental Science & Technology, 2008, 5 : 183 - 194
  • [9] DETERMINATION OF OPEN PIT MINING CUT-OFF GRADE STRATEGY USING COMBINATION OF NONLINEAR PROGRAMMING AND GENETIC ALGORITHM
    Azimi, Yousuf
    Osanloo, Morteza
    [J]. ARCHIVES OF MINING SCIENCES, 2011, 56 (02) : 189 - 212
  • [10] Production scheduling of open-pit mines using genetic algorithm: a case study
    Alipour, Aref
    Khodaiari, Ali Asghar
    Jafari, Ahmad
    Tavakkoli-Moghaddam, Reza
    [J]. INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2020, 15 (03) : 176 - 183