Integrated Digital System in Planning, Scheduling and Logistics Processes at a Petroleum Company

被引:0
|
作者
Sihlali, Buhle [1 ]
Telukdarie, Arnesh [2 ]
机构
[1] Univ Johannesburg, Post Grad Sch Engn Management, Johannesburg, South Africa
[2] Univ Johannesburg, Johannesburg Business Sch, Johannesburg, South Africa
关键词
4IR; Enterprise Resource Planning; Integration; Supply Chain Management; Value Stream Mapping; INDUSTRY; 4.0;
D O I
10.1109/ICE/ITMC-IAMOT55089.2022.10033320
中图分类号
F [经济];
学科分类号
02 ;
摘要
A petroleum company's operations are a function of many teams that cannot exist in isolation as roles and tasks integrate, especially within the planning, scheduling, and logistics team. The information that is supplied, and used, and the decisions made by these stakeholders are what make the business function. The problem that exists in the organisation's supply chain cycle is the lack of data transparency across the teams. The data is stored and managed by each individual division manually, resulting in a lack of integration causing a discontinuity in the process flows. This study analyses the importance of using a Value Stream Mapping (VSM) in planning, scheduling, and logistics processes at a petroleum company that is part of a joint venture refinery and its importance in an integrated digital system. The major findings from using Value Stream Mapping (VSM) are the value of time and costs in improving efficiencies, the appreciation of the existing technologies used in the petroleum industry, and the importance of using integrated digital technologies to improve systems. The study concludes that using an improved VSM to integrate the digital system is vital in the supply chain for both internal and external use in the organisation as the 4th Industrial Revolution (4IR) systems require rapid responses.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] Planning of the function in integrated logistics area
    [J]. Li, Y.-Q., 2001, Shanghai Jiao Tong University (35):
  • [32] Planning of the functions in the integrated logistics area
    Li, YQ
    Hua, W
    Sun, YW
    [J]. TRAFFIC AND TRANSPORTATION STUDIES, VOLS 1 AND 2, PROCEEDINGS, 2002, : 1534 - 1539
  • [33] Integrated Resource Planning in Maintenance Logistics
    Al Hanbali, Ahmad
    Rahimi-Ghahroodi, Sajjad
    Zijm, Henk
    [J]. ERCIM NEWS, 2016, (105): : 35 - +
  • [34] A web-based integrated process planning and scheduling system
    Wang, Y. F.
    Zhang, Y. F.
    Fuh, J. Y. H.
    Zhou, Z. D.
    Xue, L. G.
    Lou, P.
    [J]. 2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2008, : 662 - +
  • [35] An optimization algorithm for integrated remanufacturing production planning and scheduling system
    Wen, Haijun
    Hou, Shiwang
    Liu, Zhaohua
    Liu, Yongjiang
    [J]. CHAOS SOLITONS & FRACTALS, 2017, 105 : 69 - 76
  • [36] An integrated production planning and scheduling system for hybrid flowshop organizations
    Riane, F
    Artiba, A
    Iassinovski, S
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 74 (1-3) : 33 - 48
  • [37] Proterv-II:: An integrated production planning and scheduling system
    Kovács, A
    Egri, P
    Kis, T
    Váncza, J
    [J]. PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING - CP 2005, PROCEEDINGS, 2005, 3709 : 880 - 880
  • [38] An integrated process planning and scheduling system for block assembly in shipbuilding
    Cho, KK
    Oh, JS
    Ryu, KR
    Choi, HR
    [J]. CIRP ANNALS 1998 - MANUFACTURING TECHNOLOGY, VOL 47, NO 1, 1998, 47 : 419 - 422
  • [39] Model construction of planning and scheduling system based on digital twin
    Wang, Yunrui
    Wu, Zhengli
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2020, 109 (7-8): : 2189 - 2203
  • [40] Model construction of planning and scheduling system based on digital twin
    Yunrui Wang
    Zhengli Wu
    [J]. The International Journal of Advanced Manufacturing Technology, 2020, 109 : 2189 - 2203