Integrated Digital System in Planning, Scheduling and Logistics Processes at a Petroleum Company

被引:0
|
作者
Sihlali, Buhle [1 ]
Telukdarie, Arnesh [2 ]
机构
[1] Univ Johannesburg, Post Grad Sch Engn Management, Johannesburg, South Africa
[2] Univ Johannesburg, Johannesburg Business Sch, Johannesburg, South Africa
关键词
4IR; Enterprise Resource Planning; Integration; Supply Chain Management; Value Stream Mapping; INDUSTRY; 4.0;
D O I
10.1109/ICE/ITMC-IAMOT55089.2022.10033320
中图分类号
F [经济];
学科分类号
02 ;
摘要
A petroleum company's operations are a function of many teams that cannot exist in isolation as roles and tasks integrate, especially within the planning, scheduling, and logistics team. The information that is supplied, and used, and the decisions made by these stakeholders are what make the business function. The problem that exists in the organisation's supply chain cycle is the lack of data transparency across the teams. The data is stored and managed by each individual division manually, resulting in a lack of integration causing a discontinuity in the process flows. This study analyses the importance of using a Value Stream Mapping (VSM) in planning, scheduling, and logistics processes at a petroleum company that is part of a joint venture refinery and its importance in an integrated digital system. The major findings from using Value Stream Mapping (VSM) are the value of time and costs in improving efficiencies, the appreciation of the existing technologies used in the petroleum industry, and the importance of using integrated digital technologies to improve systems. The study concludes that using an improved VSM to integrate the digital system is vital in the supply chain for both internal and external use in the organisation as the 4th Industrial Revolution (4IR) systems require rapid responses.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] PRODUCTION PLANNING AND SCHEDULING FOR AN INTEGRATED CONTAINER COMPANY
    HAESSLER, RW
    [J]. AUTOMATICA, 1985, 21 (04) : 445 - 452
  • [2] INTEGRATED OPTIMIZATION MODEL FOR PRODUCTION PLANNING AND SCHEDULING WITH LOGISTICS CONSTRAINTS
    Chen, Y. X.
    [J]. INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2016, 15 (04) : 711 - 720
  • [3] The Design of Integrated Logistics Management System of an Industrial Company
    Hart, Martin
    [J]. 18TH INTERNATIONAL SCIENTIFIC CONFERENCE-LOGI 2017, 2017, 134
  • [4] Design on Planning Simulation of Integrated Logistics System
    Xiang, Pan
    [J]. 2017 IEEE 2ND ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC), 2017, : 2029 - 2033
  • [5] MODEL-BUILDING, PLANNING AND SCHEDULING IN AN INTEGRATED OIL COMPANY
    SORENSEN, EE
    [J]. OPERATIONS RESEARCH, 1958, 6 (06) : 902 - 902
  • [6] AN INTEGRATED SCHEDULING PLANNING ENVIRONMENT FOR PETROCHEMICAL PRODUCTION PROCESSES
    NUMAO, M
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 1995, 8 (02) : 263 - 273
  • [7] Integrated Planning, Scheduling, and Dynamic Optimization for Continuous Processes
    Shi, Hanyu
    Chu, Yunfei
    You, Fengqi
    [J]. 2014 IEEE 53RD ANNUAL CONFERENCE ON DECISION AND CONTROL (CDC), 2014, : 388 - 393
  • [8] Monthly Logistics Planning for a Trading Company
    Ulku, Ilayda
    Kullab, Huthayfah
    Al Mulqi, Talha
    Almsadi, Ali
    Abousaleh, Raed
    [J]. DIGITIZING PRODUCTION SYSTEMS, ISPR2021, 2022, : 500 - 509
  • [9] Integrated Production Planning and Scheduling System Design
    Li Liqing
    Lu Hai
    Li Gongliang
    Yang Guanghong
    [J]. PROCEEDINGS OF 2017 8TH IEEE INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING AND SERVICE SCIENCE (ICSESS 2017), 2017, : 731 - 734
  • [10] Integrated data logistics in an energy company
    Heine, P
    [J]. WIRTSCHAFTSINFORMATIK, 2000, 42 (05): : 434 - +