Quantity-based approach to preliminary cost estimates for highway projects

被引:24
|
作者
Chou, Jui-Sheng
Peng, Min
Persad, Khali R.
O'Connor, James T.
机构
[1] Natl Chung Cheng Univ, Dept Business Adm, Chiayi 621, Taiwan
[2] Univ Texas, Dept Civil Architectural & Environm Engn, Austin, TX 78712 USA
[3] Univ Texas, Ctr Transportat Res, Austin, TX 78712 USA
来源
CONSTRUCTION 2006 | 2006年 / 1946期
关键词
D O I
10.3141/1946-03
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The preliminary cost estimate heavily influences the fate of a transportation project, yet it can be up to an order of magnitude off the final bid amount. Poor prediction of costs in state departments of transportation can lead to less-than-optimal project selection at the front end and delays later when funding is not adequate to cover planned projects. A demonstration is made of the potential to separate quantity uncertainty from price uncertainty. If item quantities can be predicted early, then readily available unit prices can be applied to create a semidetailed preliminary estimate. Compared with the typical practice of applying a gross cost per lane mile, the proposed approach provides a more detailed basis for tracking the effects of changes during project development. This methodology is being tested for implementation by the Texas Department of Transportation.
引用
收藏
页码:22 / 30
页数:9
相关论文
共 50 条
  • [1] New Approach to Developing Conceptual Cost Estimates for Highway Projects
    El Asmar, Mounir
    Hanna, Awad S.
    Whited, Gary C.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (11): : 942 - 949
  • [2] The impact of quantity-based cost decline on supplier encroachment
    Sun, Xiaojie
    Tang, Wansheng
    Zhang, Jianxiong
    Chen, Jing
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 147
  • [3] The impact of quantity-based cost decline on supplier encroachment
    Sun, Xiaojie
    Tang, Wansheng
    Zhang, Jianxiong
    Chen, Jing
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 147
  • [4] Quantity-based and value-based cost planning in marginal cost accounting and process cost accounting
    Lengsfeld, S
    Schiller, U
    [J]. BETRIEBSWIRTSCHAFTLICHE FORSCHUNG UND PRAXIS, 1998, 50 (01): : 118 - 139
  • [5] Quantity-based emergency shipment policies
    Poormoaied, Saeed
    Atan, Zumbul
    van Woensel, Tom
    [J]. IISE TRANSACTIONS, 2022, 54 (12) : 1186 - 1198
  • [6] System cost and bullwhip effect in quantity-based VMI consolidation replenishment system
    Zhang, Li-Bo
    Han, Yu-Qi
    Chen, Jie
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2007, 13 (02): : 410 - 416
  • [7] Preliminary Cost Estimation of Highway Projects Using Statistical Learning Methods
    Zhang, Yuanxin
    Minchin Jr, R. Edward
    Flood, Ian
    Ries, Robert J.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (05)
  • [8] Research on the quantity-based delivery policy in VMI
    Liu Peng Fei
    [J]. PROCEEDINGS OF THE 2007 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING - MANAGEMENT AND ORGANIZATION STUDIES SECTION, 2007, : 1298 - 1303
  • [9] Simulation of Quantity-based VMI Consolidation Replenishment
    Wang Yi
    Lin Jianliang
    [J]. LOGISTICS RESEARCH AND PRACTICE IN CHINA, 2008, : 233 - 237
  • [10] Quantity-based judgments in the domestic dog (Canis lupus familiaris)
    Camille Ward
    Barbara B. Smuts
    [J]. Animal Cognition, 2007, 10 : 71 - 80