Project Evaluation and Analysis of Metrological Verification Regulation Based on Fuzzy Comprehensive Analysis Method

被引:0
|
作者
Zhu Jing [1 ]
Liu Jiaxin [2 ]
机构
[1] RIOH, NC MERB, 8 West Tucheng Rd, Beijing, Peoples R China
[2] RIOH, 8 West Tucheng Rd, Beijing, Peoples R China
关键词
D O I
10.1088/1742-6596/1187/3/032104
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The technical specification of highway engineering measurement has been applied as an independent field since 2016. But at present, there is a lack of concrete evaluation methods in the process of project establishment. Within the scope of Highway Engineering Metrology Technical system table, starting from the technical attributes of instruments and equipment such as road engineering, bridge and tunnel engineering, traffic engineering, and combining with the demand of future highway metrology management, it is one of the important means to evaluate the whole process of Highway Engineering Metrology Technical specification scientifically. Based on the fuzzy comprehensive analysis method, this paper tries to simulate the quantitative analysis and evaluation of a metrological verification regulation project, identifies the main factors of the project evaluation, carries out the weight analysis, and finally obtains the quantitative evaluation results. The analysis results show that the evaluation index of metrological verification regulation project is divided into three levels. The first level index is the evaluation of research project. The second level index mainly includes five contents: the necessity of project establishment, the main content and the research scheme, the expected benefit, the research supporting conditions and the risk. The third level index project evaluation content is included in the sub-content. The capacity includes 22 categories, which fully reflects the main factors of project evaluation. The maximum value of the comprehensive quantitative total evaluation element is 0.471, which belongs to the "excellent" evaluation grade, and the project evaluation control effect belongs to the excellent grade.
引用
收藏
页数:7
相关论文
共 50 条
  • [41] Study on Project Manager Selection Based on Fuzzy Comprehensive Evaluation
    Yue Pengwei
    Wang Mengjun
    [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 439 - 442
  • [42] Tenders evaluation method of engineering project based on Value Engineering and multistage fuzzy comprehensive appraisal
    Jin Hongxia
    Zhao Jianna
    Wang Xiaojun
    [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 237 - 241
  • [43] Application of fuzzy comprehensive evaluation method in engineering project risk management
    Gao, Lang
    Li, Xin
    [J]. CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 3087 - 3090
  • [44] Investment Risk Evaluation in Real Estates Based on Fuzzy Comprehensive Analysis
    Jin Yushi
    [J]. PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT, VOLS I AND II, 2010, : 1325 - 1329
  • [45] Requirements analysis on the highway emergency resource based on fuzzy comprehensive evaluation
    Ge, Tao
    [J]. SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2779 - 2783
  • [46] An empirical analysis of the undergraduates' vocational adaptability based on fuzzy comprehensive evaluation
    Sang Jinyan
    Zhang Yinghua
    Qi Zhenfa
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2007, : 2484 - 2489
  • [47] Comprehensive Analysis of Risky Driving Behaviors Based on Fuzzy Evaluation Model
    Pei, Yulong
    Qi, Weiwei
    Zhang, Xupeng
    Song, Mo
    [J]. ADVANCES IN FUTURE COMPUTER AND CONTROL SYSTEMS, VOL 2, 2012, 160 : 507 - +
  • [48] Empirical Analysis of Express Service Quality Based on Fuzzy Comprehensive Evaluation
    Fan, Xin
    Zheng, Mengyao
    [J]. FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE II, PTS 1-6, 2012, 121-126 : 4456 - 4460
  • [49] Risk Analysis based on Fuzzy Comprehensive Evaluation for Maglev Train Bogie
    Fan, Chengxin
    Dou, Fengshan
    Tong, Baiming
    Long, Zhiqiang
    [J]. 2015 CHINESE AUTOMATION CONGRESS (CAC), 2015, : 952 - 956
  • [50] Fuzzy Comprehensive Evaluation on the Projects Risk Based Set Pair Analysis
    Li, Gaoyang
    [J]. MECHATRONICS AND INTELLIGENT MATERIALS II, PTS 1-6, 2012, 490-495 : 1221 - 1225