BIM-integrated TOPSIS-Fuzzy framework to optimize selection of sustainable building components

被引:42
|
作者
Fazeli, Abdulwahed [1 ]
Jalaei, Farzad [2 ]
Khanzadi, Mostafa [3 ]
Banihashemi, Saeed [3 ]
机构
[1] IUST, Dept Civil Engn, Tehran, Iran
[2] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ, Canada
[3] Univ Canberra, Sch Built Environm & Design, Canberra, ACT, Australia
关键词
Building Information Modeling (BIM); Multiple Attribute Decision Support System (MADSS); Fuzzy-TOPSIS; sustainable building components; DECISION-MAKING; DESIGN; PERFORMANCE; OPPORTUNITIES; SYSTEM; MODEL; DSS;
D O I
10.1080/15623599.2019.1686836
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Existence of diverse sustainable materials with distinctive features causes more difficult decision makings for project teams especially when it is intended to use ideal materials from diverse types of sustainable products. Few research studies have been conducted so far on applying Building Information Modeling (BIM) to act as Decision Support System (DSS) using of math works functions and tools in combination with Multiple Criteria Decision-Making (MCDM) techniques. The main purpose of this study is to propose a methodology that integrates BIM with decision-making and problem-solving approaches including Fuzzy and TOPSIS in order to efficiently optimize the selection of sustainable building components at the conceptual design stage of building projects. To select the optimum building components, each item is assessed against three major attributes of decision criteria as Design, Economic and Quality factors, which are applied in Multiple Attribute Decision Support System (MADSS) methodology to indicate the various performance of buildings sustainability. This BIM-integrated process is linked to the engine of Matlab software to apply Fuzzy functions on the users' priority in order to automatically suggest the ideal solutions. The design alternatives suggested by Matlab is validated by Life Cycle Cost (LCC) method to analyze the operational cost of an actual building project. Using this innovative method will make the decision-making procedure more convenient as well as proposing more realistic and reliable final and sustainable optimized choice.
引用
收藏
页码:1240 / 1259
页数:20
相关论文
共 50 条
  • [31] A Framework for a Fuzzy Sustainable Maintenance Strategy Selection Problem
    Nezami, Farnaz Ghazi
    Yildirim, Mehmet Bayram
    [J]. 2011 IEEE INTERNATIONAL SYMPOSIUM ON SUSTAINABLE SYSTEMS AND TECHNOLOGY (ISSST), 2011,
  • [32] An integrated approach for multiple criteria supplier selection combining Fuzzy Delphi, Fuzzy AHP & Fuzzy TOPSIS
    Sultana, Ineen
    Ahmed, Imtiaz
    Azeem, Abdullahil
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 29 (04) : 1273 - 1287
  • [33] Sustainable supplier selection: A multi-criteria intuitionistic fuzzy TOPSIS method
    Memari, Ashkan
    Dargi, Ahmad
    Jokar, Mohammad Reza Akbari
    Ahmad, Robiah
    Rahim, Abd Rahman Abdul
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2019, 50 : 9 - 24
  • [34] Framework for sustainable maintenance system: ISM-fuzzy MICMAC and TOPSIS approach
    Singh, Rajesh Kumar
    Gupta, Ayush
    [J]. ANNALS OF OPERATIONS RESEARCH, 2020, 290 (1-2) : 643 - 676
  • [35] Sustainable building material selection: An integrated multi-criteria large group decision making framework
    Chen, Zhen-Song
    Yang, Lan-Lan
    Chin, Kwai-Sang
    Yang, Yi
    Pedrycz, Witold
    Chang, Jian-Peng
    Martinez, Luis
    Skibniewski, Miroslaw J.
    [J]. APPLIED SOFT COMPUTING, 2021, 113
  • [36] Automatic System Design of Assembly Building Components for Sustainable Building Projects Based on BIM Technology
    Wang, Wenjing
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [37] An Integrated Fuzzy TOPSIS-Knapsack Problem Model for Order Selection in a Bakery
    Ic, Yusuf Tansel
    Ozel, Melis
    Kara, Imdat
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2017, 42 (12) : 5321 - 5337
  • [38] An integrated fuzzy TOPSIS and MCGP approach to supplier selection in supply chain management
    Liao, Chin-Nung
    Kao, Hsing-Pei
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (09) : 10803 - 10811
  • [39] An Integrated Fuzzy TOPSIS-Knapsack Problem Model for Order Selection in a Bakery
    Yusuf Tansel İç
    Melis Özel
    İmdat Kara
    [J]. Arabian Journal for Science and Engineering, 2017, 42 : 5321 - 5337
  • [40] Exterior walls selection framework using Building Information Modeling (BIM)
    Saud, Ammar M.
    Al-Gahtani, Khalid S.
    Alsugair, Abdullah M.
    [J]. COGENT ENGINEERING, 2022, 9 (01):