Construction of Tourism Management Mode Based on Project Management Theory

被引:0
|
作者
Hua, E. [1 ]
机构
[1] Heilongjiang Univ Technol, Jixi 158100, Heilongjiang, Peoples R China
关键词
tourism management; project management; construction model;
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
It is one of the most important factors influencing the development and improvement of the tourism management. To establish a comprehensive and perfect tourism management model is one of the most important factors in the development of the tourism industry, it is also constantly improving its own. Whether it is normal day-to-day operation or practical benefits, the need of project management theory is the main basis. Now the reality of the situation, the project management theory has gradually been used to the tourism management related to the operating mode. This paper will analyze the basic theory of project management and the impact of the basic management mode of tourism management to discuss and summarize the introduction of the project theory in the modern tourism management model to create a specific way to explore. In the process of carrying out a certain project activity, the use of various means, including technology, skills, knowledge or tools, so that the needs of the entire activities and activities to achieve the desired objectives of the project can achieve a more appropriate level of demand. The process can be called project management. Now the reality of the situation, the project management theory has become a modern business management process which is a more important discipline, which in all areas of culture are reflected. With the deepening of reform and opening up, the mode and level of economic development have gradually realized a more comprehensive improvement, and actively use the local tourism resources for tourism economic development, has gradually become the focus of development. In the process of establishing modern tourism management model, the basic theory of project management can be used appropriately, which can bring more high overall management level to the tourism industry. This paper will start the analysis.
引用
收藏
页码:1055 / 1059
页数:5
相关论文
共 50 条
  • [31] Critical chain project management for a highway construction project with a focus on theory of constraints
    Sarkar, Debasis
    Jha, K. N.
    Patel, Shraddha
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (02) : 194 - 207
  • [32] Evolutionary Game Theory Applied to Construction Project Conflict Management
    Ding, Jie
    [J]. PROCEEDINGS OF ISCRAM CHINA 2010: FOURTH INTERNATIONAL CONFERENCE ON INFORMATION SYSTEMS FOR CRISIS RESPONSE AND MANAGEMENT, 2010, : 521 - 524
  • [33] Application of Asymmetric Information Theory to Construction Project Risk Management
    Xiang Pengcheng
    [J]. PROCEEDINGS OF 2010 INTERNATIONAL SYMPOSIUM ON CONSTRUCTION ECONOMY AND MANAGEMENT (ISCEM2010), 2010, : 1 - 6
  • [34] An Assistance to Project Risk Management Based on Complex Systems Theory and Agile Project Management
    Marle, Franck
    [J]. COMPLEXITY, 2020, 2020
  • [35] Cost management system of electric power engineering project based on project management theory
    Liu, Dunnan
    Zhang, Xian
    Gao, Chuncheng
    Yang, Mo
    Li, Qi
    Li, Mu
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 34 (02) : 975 - 984
  • [36] Study on the Construction Project Scheduling and Management Mode from the Perspective of Collaborative Management and Process Optimization
    Song Aiping
    [J]. INTERNATIONAL SYMPOSIUM 2017 - MECHANICAL AND ELECTRONICAL SYSTEMS AND CONTROL ENGINEERING, 2017, : 84 - 88
  • [37] Research on Project Construction Cost Major Talent Training Mode Based on Management Science and Engineering
    Yang, Yin
    Xu, Tong
    Zhang, Lifeng
    Gong, Zongxin
    [J]. PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE AND HIGHER EDUCATION, 2016, 53 : 135 - 138
  • [38] Large-scale Construction Project Organization Management Mode in the Railway Construction Enterprise
    Ren Xu
    Hao Shengyue
    [J]. CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 2596 - 2600
  • [39] Towards an Outcome Based Project Management Theory
    Zwikael, Ofer
    Smyrk, John R.
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 633 - 637
  • [40] Study on Objective-total Cost Management Mode of Construction Project
    Nie, Shu-Min
    Ren, Feng
    Liu, Xiao-Liang
    [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND MANAGEMENT INNOVATION, 2014, : 603 - 607