Experiment study on continuous commissioning a real VAV system

被引:0
|
作者
Wang, FL [1 ]
Yoshida, H [1 ]
Tsubaki, IMM [1 ]
Itou, K [1 ]
机构
[1] Kyoto Univ, Dept Urban & Environm Engn, Kyoto 6068501, Japan
关键词
automated continuous commissioning; variable air volume (VAV) systems; fault detection and diagnosis (FDD); experiment study;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In order to study the automated continuous commissioning characteristics of VAV systems, a set of experiments were conducted on a real VAV system in the office building of Yamatake Building System Company. Four types faults, which are top problems amenable to automated continuous commissioning, were introduced into the VAV system. The performance data of the VAV system were measured and automatically recorded once a minute using a data logger. From the experiment results, three conclusions can be drawn: 1) Automated continuous commissioning is feasible if simulation analysis and operation records are used for commissioning, and new simulation models suitable for continuous commissioning are need; 2) Operation records are useful for continuous commissioning sensors; 3) If the status of a component changes, the relevant variables, such as supply air volume, air temperature, pressure etc., do not change simultaneously. Some variables change several minutes late. This change delay should be taken into consideration during automated on-line commissioning.
引用
收藏
页码:959 / 966
页数:8
相关论文
共 50 条
  • [31] Status and commissioning of the ATLAS experiment at the LHC
    Di Ciaccio, A.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2009, 602 (03): : 682 - 686
  • [32] Commissioning of the Ion Implanter for the HOLMES Experiment
    M. De Gerone
    A. Bevilacqua
    M. Biasotti
    M. Borghesi
    N. Cerboni
    G. Ceruti
    G. De Bodin De Galembert
    M. Faverzani
    M. Fedkevych
    E. Ferri
    G. Gallucci
    F. Gatti
    A. Giachero
    A. Lo Cicero
    E. Maugeri
    P. Manfrinetti
    A. Nucciotti
    L. Parodi
    G. Pessina
    P. Pollovio
    R. Puppo
    S. Ragazzi
    C. Rossi
    D. Schumann
    F. Siccardi
    Journal of Low Temperature Physics, 2022, 209 : 1135 - 1142
  • [33] Commissioning of the PADME experiment with a positron beam
    Albicocco, P.
    Assiro, R.
    Bossi, F.
    Branchini, P.
    Buonomo, B.
    Capirossi, V
    Capitolo, E.
    Capoccia, C.
    Caricato, A. P.
    Ceravolo, S.
    Chiodini, G.
    Corradi, G.
    De Sangro, R.
    Di Giulio, C.
    Domenici, D.
    Ferrarotto, F.
    Fiore, S.
    Finocchiaro, G.
    Foggetta, L. G.
    Frankenthal, A.
    Garattini, M.
    Georgiev, G.
    Giacchino, F.
    Ghigo, A.
    Gianotti, P.
    Gontad, F.
    Iazzi, F.
    Ivanov, S.
    Ivanov, Sv
    Kozhuharov, V
    Leonardi, E.
    Long, E.
    Martini, M.
    Martino, M.
    Miccoli, A.
    Oceano, I
    Oliva, F.
    Organtini, G. C.
    Pinna, F.
    Piperno, G.
    Pinto, C.
    Raggi, M.
    Tehrani, F. Safai
    Saputi, A.
    Sarra, I
    Sciascia, B.
    Simeonov, R.
    Spadaro, T.
    Spagnolo, S.
    Spiriti, E.
    JOURNAL OF INSTRUMENTATION, 2022, 17 (08)
  • [34] Commissioning of the Pair Spectrometer of the GlueX experiment
    Somov, A.
    Tolstukhin, I.
    Somov, S. V.
    Berdnikov, V. V.
    INTERNATIONAL CONFERENCE ON PARTICLE PHYSICS AND ASTROPHYSICS, 2017, 798
  • [35] The design, construction, and commissioning of the KATRIN experiment
    Aker, M.
    Altenmueller, K.
    Amsbaugh, J. F.
    Arenz, M.
    Babutzka, M.
    Bast, J.
    Bauer, S.
    Bechtler, H.
    Beck, M.
    Beglarian, A.
    Behrens, J.
    Bender, B.
    Berendes, R.
    Berlev, A.
    Besserer, U.
    Bettin, C.
    Bieringer, B.
    Blaum, K.
    Block, F.
    Bobien, S.
    Boettcher, M.
    Bohn, J.
    Bokeloh, K.
    Bolz, H.
    Bornschein, B.
    Bornschein, L.
    Bouquet, H.
    Boyd, N. M.
    Brunst, T.
    Burritt, T. H.
    Caldwell, T. S.
    Chaoui, Z.
    Chilingaryan, S.
    Choi, W.
    Corona, T. J.
    Cox, G. A.
    Debowski, K.
    Deffert, M.
    Descher, M.
    Barrero, D. Diaz
    Doe, P. J.
    Dragoun, O.
    Drexlin, G.
    Dunmore, J. A.
    Dyba, S.
    Edzards, F.
    Eichelhardt, F.
    Eitel, K.
    Ellinger, E.
    Engel, R.
    JOURNAL OF INSTRUMENTATION, 2021, 16 (08)
  • [36] Commissioning of the electron injector for the AWAKE experiment
    Kim, S-Y
    Doebert, S.
    Apsimon, O.
    Apsimon, R.
    Burt, G.
    Dayyani, M.
    Gessner, S.
    Gorgisyan, I
    Granados, E.
    Mazzoni, S.
    Moody, J. T.
    Turner, M.
    Williamson, B.
    Chung, M.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2020, 953
  • [37] Status and commissioning of the ALICE experiment at the LHC
    Antonioli, P.
    NUOVO CIMENTO DELLA SOCIETA ITALIANA DI FISICA B-BASIC TOPICS IN PHYSICS, 2008, 123 (6-7): : 738 - 740
  • [38] NHS commissioning system No data, no commissioning
    West, Peter A.
    BRITISH MEDICAL JOURNAL, 2010, 340
  • [39] The Simulation Study of Adaline PID Control and Decoupling for the VAV System
    Dong, A'ni
    Hu, Qinhua
    Ren, Qingchang
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 5082 - +
  • [40] Distributed real time control in RFX-mod nuclear fusion experiment: Commissioning and first results
    Cavinato, Mario
    Manduchi, Gabriele
    Luchetta, Adriano
    Marchiori, Giuseppe
    Taliercio, Cesare
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 2006, 53 (03) : 1015 - 1021