Jacking-up offshore steel

被引:0
|
作者
Smith, A [1 ]
Dover, B [1 ]
机构
[1] CITY UNIV LONDON,LONDON EC1V 0HB,ENGLAND
关键词
D O I
暂无
中图分类号
TQ174 [陶瓷工业]; TB3 [工程材料学];
学科分类号
0805 ; 080502 ;
摘要
The offshore industry has recognised the potential for using high strength steels to reduce cost and weight. This recognition has led to their incorporation into rig designs and to a need for corrosion fatigue data, describe Alan Smith and Bill Dover.
引用
收藏
页码:454 / 456
页数:3
相关论文
共 50 条
  • [31] Field performance of steel pipes during curve jacking in Gongbei tunnel
    Zhang, Peng
    Feng, Xin
    Zeng, Cong
    Ariaratnam, Samuel T.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 128
  • [32] Field performance of steel pipes during curve jacking in Gongbei tunnel
    Faculty of Engineering, China University of Geosciences, No. 388 Lumo Road, Wuhan
    Hubei Province, China
    不详
    AZ, United States
    Tunn. Undergr. Space Technol.,
  • [33] Stepping up offshore safety
    Lemetais, C.
    2001, Institution of Chemical Engineers
  • [34] Stepping up offshore safety
    Lemetais, C
    CHEMICAL ENGINEER-LONDON, 2001, (718): : 32 - 33
  • [35] STEPPING UP OFFSHORE DRILLING
    WECHSLER, J
    DUNS BUSINESS MONTH, 1982, 120 (01): : 37 - 37
  • [36] Werner offshore: Up and coming
    Konrad, LJ
    SEA TECHNOLOGY, 1996, 37 (09) : 83 - 83
  • [37] Research of Synchronous Jacking up Construction Monitoring and Control Technologies of Bridge
    He, Jia
    Gao, Xingzan
    PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON ARCHITECTURAL, CIVIL AND HYDRAULICS ENGINEERING (ICACHE 2016), 2016, 99 : 39 - 44
  • [38] Failure analysis of a pinion of the jacking system of a jack-up platform
    Cao, Y. G.
    Zhang, S. H.
    ENGINEERING FAILURE ANALYSIS, 2013, 33 : 212 - 221
  • [39] Electroslag Remelting Withdrawing Technology for Offshore Jack-up Platform Rack Steel Manufacturing Process
    Xi-min ZANG
    Tian-yu QIU
    Wan-ming LI
    Xin DENG
    Zhou-hua JIANG
    Hua SONG
    Journal of Iron and Steel Research(International), 2016, 23 (04) : 297 - 304
  • [40] Electroslag remelting withdrawing technology for offshore jack-up platform rack steel manufacturing process
    Xi-min Zang
    Tian-yu Qiu
    Wan-ming Li
    Xin Deng
    Zhou-hua Jiang
    Hua Song
    Journal of Iron and Steel Research International, 2016, 23 : 297 - 304