Infrastructure Project Investment Decision Timing Using a Real Options Analysis Framework with Rainbow Option

被引:4
|
作者
Siripongvakin, Jatupol [1 ]
Athigakunagorn, Nathee [1 ]
机构
[1] Kasetsart Univ, Dept Civil Engn, Fac Engn Kamphaeng Saen, Nakhon Pathom 73140, Thailand
关键词
Construction project investment; Decision timing; Real options analysis; Binomial method; Rainbow option; VALUATION;
D O I
10.1061/AJRUA6.0001080
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The infrastructure construction industry has always been plagued with significant uncertainty. It is therefore crucial for decision makers (DMs) to ascertain suitable investment timing, and there is still a need for a paradigm to assist them. Real options analysis (ROA) is a project evaluation method that allows DMs to incorporate volatility into their analyses. This study uses ROA to create a decision framework to determine the optimal infrastructure investment decision timing. Two types of ROA, the traditional option and the rainbow option, are used in the analysis to examine the impacts of these methods on timing. The paper's case study involves construction of a gas station in the Bangkok metropolitan region and takes the price of and demand for gas as the sources of uncertainty. The paper also carries out a loss value analysis. The results suggest that the DM should postpone the decision further when volatility increases due to a "wait-and-see" strategy. We introduce loss value to compensate for depreciation in the value of the project due to deferment. The results of the evaluation and the sensitivity analysis confirm that compared to nonconsideration of investment value, consideration can lead to an earlier optimal time for the investment. (C) 2020 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Research on the real options in investment decision ofwaterway infrastructure construction
    Wei, Jin
    RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 1617 - 1620
  • [2] Real options analysis of the timing of IS investment decisions
    Campbell, JA
    INFORMATION & MANAGEMENT, 2002, 39 (05) : 337 - 344
  • [3] The Application of Real Option Method for Investment Decision of Real Estate Project
    Wang, Zhen
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, COMMERCE AND SOCIETY, 2015, 17 : 11 - 15
  • [4] Application Research on Real Option to Hydropower Project Investment Decision
    Jin Zhenhui
    Feng xiaoling
    Xu Limin
    Xu Liu
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 1533 - 1536
  • [5] The application and analysis of real options in IT project investment
    Wang, TN
    Sun, XL
    Proceedings of the 2005 International Conference on Management Science & Engineering (12th), Vols 1- 3, 2005, : 2532 - 2536
  • [6] Investment decision analysis of shipping desulfurization project based on a fuzzy real option approach
    Yu, Fangping
    Meng, Bin
    Guo, Jie
    Fan, Lidong
    Shi, Wenming
    MARITIME POLICY & MANAGEMENT, 2024,
  • [7] Developing an Investment Decision Model Associated With Mega-Infrastructure Using Real Option Theory
    Mao Liuyan
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 2560 - 2564
  • [8] The research on application of real option theory on investment decision of real estate project
    Liu, YM
    Lu, CB
    Proceedings of the 2005 International Conference on Management Science and Engineering, 2005, : 1097 - 1102
  • [9] Study on the Timing of Investment Decision of Real Estate Projects Based on the Real Option Theory
    Yang, Yang
    Tan, Huashan
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE, 2014, 101 : 410 - 413
  • [10] Real option characteristic and economic analysis of project investment
    Zhuang, XT
    Zhang, D
    Huang, XY
    PROCEEDINGS OF 2002 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2002, : 1509 - 1513