Management of the ITER Buildings Configuration for the Construction and Installation Phase

被引:1
|
作者
Kuehn, Ingo [1 ]
Cordier, Jean-Jacques [1 ]
Baylard, Christophe [1 ]
Kotamaki, Miikka [1 ]
Patisson, Laurent [1 ]
Reich, Jens [1 ]
Ring, William [1 ]
机构
[1] ITER Org, F-13067 St Paul Les Durance, France
关键词
Building; configuration management (CM); installation; integration; ITER; project schedule; tokamak;
D O I
10.1109/TPS.2017.2773125
中图分类号
O35 [流体力学]; O53 [等离子体物理学];
学科分类号
070204 ; 080103 ; 080704 ;
摘要
The ITER project consists of a wide range of complex systems and interfaces which needs to be configured and controlled over the lifetime of the project with a comprehensive configuration management in place. The different maturities of the systems and their schedule need to be integrated in the overall project schedule in order to allow the project to stay in planned cost and schedule. The interfaces have to be advanced for those systems that are still in conceptual design phase to have sufficient information to advance with the systems facing the manufacturing readiness review (MRR). In order to achieve the project objectives, the structure of the ITER Organization (IO) Central Team (CT) is being adapted toward the ongoing construction phase on site as well as in the domestic agencies (DA) with a streamlined organization. Area manager posts have been created for all buildings, the site and the tokamak machine in order to have a prompt decision-making in design and construction phase following project change requests, system deviation requests, and field change requests. Weekly meetings are held between the IO CT with the DA and their contractors to feed the proposed modifications in the project baseline documentation including the associated cost and schedule impact. In parallel the project is preparing the installation phase of the machine and the plant systems layout in identifying the systems required for the first plasma, but also those which are "captive" and need to be installed during the civil works of the building. The schedule for each building and level has been developed to review the required duration and manpower in each area. As the installation of the systems and components will start at the defined ready for equipment dates for each areas and levels, the co-activities among the contractors have to be agreed.
引用
收藏
页码:194 / 200
页数:7
相关论文
共 50 条
  • [1] Management of the ITER buildings configuration for the construction and installation phase
    Kuehn, Ingo
    Cordier, Jean-Jacques
    Baylard, Christophe
    Kotamaki, Miikka
    Patisson, Laurent
    Reich, Jens
    Ring, William
    [J]. 2015 IEEE 26TH SYMPOSIUM ON FUSION ENGINEERING (SOFE), 2015,
  • [2] CONFIGURATION MANAGEMENT OF ITER
    Kuehn, Ingo
    [J]. FUSION SCIENCE AND TECHNOLOGY, 2013, 64 (02) : 103 - 110
  • [3] The ITER magnet system: configuration and construction status
    Mitchell, Neil
    Devred, Arnaud
    [J]. FUSION ENGINEERING AND DESIGN, 2017, 123 : 17 - 25
  • [4] System engineering and configuration management in ITER
    Chiocchio, S.
    Martin, E.
    Barabaschi, P.
    Bartels, Hans Werner
    How, J.
    Spears, W.
    [J]. FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) : 548 - 554
  • [5] Development on systems configuration in ITER Tokamak Complex and Auxiliary Buildings
    Kuehn, Ingo
    Kotamaki, Miikka
    Schmieder, Laurent
    Cordier, Jean-Jacques
    Chiocchio, Stefano
    Carafa, Leontin
    Klingsmith, James
    Patisson, Laurent
    Rigoni, Giuliano
    Tsedri, Thibault
    [J]. FUSION ENGINEERING AND DESIGN, 2011, 86 (6-8) : 632 - 635
  • [6] Status on Design and Construction of the ITER Buildings and Plant Systems
    Kuehn, Ingo
    Cordier, Jean-Jacques
    Carafa, Leontin
    Darbour, Romaric
    Di Giuseppe, Giovanni
    Jeannoutot, Thomas
    Kotamaki, Miikka
    Patisson, Laurent
    Perrin, Jean Lou
    Rigoni, Giuliano
    Rotella, Rossella
    Vannuffelen, Fabrice
    Vincent, Gregoire
    Zhang, Yanhong
    [J]. IEEE TRANSACTIONS ON PLASMA SCIENCE, 2018, 46 (07) : 2647 - 2652
  • [7] Status of Plant Construction in ITER Tokamak Complex Buildings
    Kuehn, Ingo
    Beltran, David
    De Boe, Pascal
    Di Giuseppe, Giovanni
    Fortunato, Federico
    Gjoklaj, Armand
    Jansen, Duco
    La Barbera, Claudio
    Marquez, Alfonso
    Orlandi, Sergio
    Roques, Bertrand
    Terada, Seiji
    Woods, Nick
    [J]. IEEE TRANSACTIONS ON PLASMA SCIENCE, 2024,
  • [8] Energy performance of buildings - construction versus systems installation?
    Schaefers, Martin
    [J]. BAUTECHNIK, 2012, 89 (09) : 640 - 648
  • [9] ITER magnet power conversion building construction and AC/DC converter installation
    Tan, H.
    Fortunato, F.
    Suh, I
    Benfatto, I
    Song, Z.
    Liu, S.
    Oh, J. S.
    Jiang, L.
    Kim, S.
    [J]. FUSION ENGINEERING AND DESIGN, 2019, 146 : 1891 - 1894
  • [10] Japanese contribution to the iter engineering design activities and preparation for the ITER construction phase
    Matsuda, S
    [J]. MATERIALS FOR ADVANCED ENERGY SYSTEMS AND FISSION AND FUSION ENGINEERING, PROCEEDINGS, 2003, : 8 - 16