Status of Plant Construction in ITER Tokamak Complex Buildings

被引:0
|
作者
Kuehn, Ingo [1 ]
Beltran, David [1 ]
De Boe, Pascal [1 ]
Di Giuseppe, Giovanni [1 ]
Fortunato, Federico [1 ]
Gjoklaj, Armand [1 ]
Jansen, Duco [1 ]
La Barbera, Claudio [1 ]
Marquez, Alfonso [1 ]
Orlandi, Sergio [1 ]
Roques, Bertrand [1 ]
Terada, Seiji [1 ]
Woods, Nick [1 ]
机构
[1] ITER Org, F-13067 St Paul Les Durance, France
关键词
Tokamak devices; Schedules; Buildings; Documentation; Procurement; Prevention and mitigation; Handover; Construction; construction schedule; engineering work packages (EWPs); handover; ITER; lessons learned;
D O I
10.1109/TPS.2024.3430481
中图分类号
O35 [流体力学]; O53 [等离子体物理学];
学科分类号
070204 ; 080103 ; 080704 ;
摘要
The ITER Project is currently in its construction phase. All plant systems required for the first plasma phase, including captive components in the Tokamak Complex buildings, are being installed. The main activities of this construction phase are in the Tokamak and Diagnostic building, now that the civil structure of the Tritium building roof is finalized. In order to launch the construction phase of the plant systems, the engineering has to be completed and documentation compiled in the form of engineering work packages (EWPs). These EWPs need to be approved, in line with the construction schedule, and must then be provided to the construction contractor for them to prepare the detailed installation work packages (IWPs). The material has to be made available and the manufacturing of the systems, structures, and components (SSCs) has to be completed, according to the requirements, as defined in the technical specifications. The Tokamak Complex as a facility has to be managed accordingly, to allow the construction of multiple building openings and penetrations. Installation of piping and mechanical systems, as well as electrical instrumentation and control (I&C) and cable pulling can then take place. This article describes the handover from engineering to the construction domain, utilizing the "EWP Toolbox" in order to provide the required content in the EWPs. The simplifications implemented in the document production have resulted in an overall cost reduction. This demonstrates that processes must be as simple as possible, providing the necessary documentation at an appropriate level of information and quality. The process of material procurement, on-time, for a large-scale project is described with the mitigation categories herein defined. The constraints to be considered in the construction phase are also described, along with the daily management of the facility and the environmental conditions that must be respected for the Tokamak machine assembly. Due to the sheer size and scale of the ITER project, these aspects can all be considered unique. The effectiveness of the visual management and the coordination of operations are, in the context of an international project such as ITER, described with "Lessons Learned" up to the construction phase provided. This article is concluded with a summary of the current status of the construction phase in the Tokamak Complex with some figures relating to the various building levels.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Status on Design and Construction of the ITER Buildings and Plant Systems
    Kuehn, Ingo
    Cordier, Jean-Jacques
    Carafa, Leontin
    Darbour, Romaric
    Di Giuseppe, Giovanni
    Jeannoutot, Thomas
    Kotamaki, Miikka
    Patisson, Laurent
    Perrin, Jean Lou
    Rigoni, Giuliano
    Rotella, Rossella
    Vannuffelen, Fabrice
    Vincent, Gregoire
    Zhang, Yanhong
    [J]. IEEE TRANSACTIONS ON PLASMA SCIENCE, 2018, 46 (07) : 2647 - 2652
  • [2] Overview of the ITER Tokamak complex building and integration of plant systems toward construction
    Cordier, Jean-Jacques
    Bak, Joo-Shik
    Baudry, Alain
    Benchikhoune, Magali
    Carafa, Leontin
    Chiocchio, Stefano
    Darbour, Romaric
    Elbez, Joelle
    di Giuseppe, Giovanni
    Iwata, Yasuhiro
    Jeannoutot, Thomas
    Kotamaki, Miikka
    Kuehn, Ingo
    Lee, Andreas
    Levesy, Bruno
    Orlandi, Sergio
    Packer, Rachel
    Patisson, Laurent
    Reich, Jens
    Rigoni, Giuliano
    Sweeney, Simon
    [J]. FUSION ENGINEERING AND DESIGN, 2015, 96-97 : 240 - 243
  • [3] Development on systems configuration in ITER Tokamak Complex and Auxiliary Buildings
    Kuehn, Ingo
    Kotamaki, Miikka
    Schmieder, Laurent
    Cordier, Jean-Jacques
    Chiocchio, Stefano
    Carafa, Leontin
    Klingsmith, James
    Patisson, Laurent
    Rigoni, Giuliano
    Tsedri, Thibault
    [J]. FUSION ENGINEERING AND DESIGN, 2011, 86 (6-8) : 632 - 635
  • [4] ITER Tokamak buildings and equipment layout
    Ahlfeld, CE
    Dilling, DA
    Ishimoto, K
    Stoner, S
    Tanaka, E
    [J]. FUSION TECHNOLOGY, 1996, 30 (03): : 611 - 617
  • [5] MCNP model of the ITER Tokamak Complex
    Lopez-Revelles, A. J.
    Catalan, J. P.
    Kolsek, A.
    Juarez, R.
    Garcia, R.
    Garcia, M.
    Sanz, J.
    [J]. FUSION ENGINEERING AND DESIGN, 2018, 136 : 859 - 863
  • [6] The ITER project construction status
    Motojima, O.
    [J]. NUCLEAR FUSION, 2015, 55 (10)
  • [7] Development of & Integration of the IC H&CD System Configuration in the ITER Tokamak Complex and Auxiliary Buildings
    Rathi, D.
    Beaumont, B.
    Arambhadiya, B.
    Beckett, B.
    Bruyere, B.
    Gassmann, T.
    Kazarian, F.
    Lamalle, Ph.
    Manon, E.
    Alonzo, T.
    Baruah, U.
    Kumar, R.
    Mukherjee, A.
    Singh, N. P.
    Singh, R.
    Trivedi, R.
    Goulding, R.
    Moon, R.
    Rasmussen, D.
    Swain, D.
    Agarici, G.
    Meunier, L.
    Mills, M.
    Sartori, R.
    Bernard, J. -M.
    Durodie, F.
    Nightingale, M.
    Shannon, M.
    Lockley, D.
    [J]. 2011 IEEE/NPSS 24TH SYMPOSIUM ON FUSION ENGINEERING (SOFE), 2011,
  • [8] Status of the KSTAR tokamak construction
    Bak, J. S.
    Yang, H. L.
    Oh, Y. K.
    Park, Y. M.
    Park, K. R.
    Choi, C. H.
    Kim, W. C.
    Sa, J. W.
    Kim, H. K.
    Lee, G. S.
    [J]. FUSION ENGINEERING AND DESIGN, 2006, 81 (20-22) : 2315 - 2324
  • [9] Status of the KSTAR tokamak construction
    Bak, J. S.
    Yang, H. L.
    Oh, Y. K.
    Park, Y. M.
    Park, K. R.
    Im, B. S.
    Choi, C. H.
    Sa, J. W.
    Lee, G. S.
    [J]. 21ST IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING - SOFE 05, 2006, : 29 - 34
  • [10] ITER Tokamak Cooling Water System Design Status
    Lioce, Donato
    Orlandi, Sergio
    Moteleb, Moustafa
    Ciampichetti, Andrea
    Afzali, Lionel
    Ghirelli, Nicolas
    Guo, Bin
    Tomasello, Marco
    Whitted, Daniel
    Giammei, Marco
    Kim, Seokho
    Van Hove, Walter
    Petrov, Andrei
    [J]. FUSION SCIENCE AND TECHNOLOGY, 2019, 75 (08) : 841 - 848