Scheduling trucks in container terminals using a genetic algorithm

被引:85
|
作者
Ng, W. C. [1 ]
Mak, K. L. [1 ]
Zhang, Y. X. [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Peoples R China
关键词
truck scheduling; container terminal; genetic algorithm;
D O I
10.1080/03052150600917128
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Trucks are the most popular transport equipment in most mega-terminals, and scheduling them to minimize makespan is a challenge that this article addresses and attempts to resolve. Specifically, the problem of scheduling a fleet of trucks to perform a set of transportation jobs with sequence-dependent processing times and different ready times is investigated, and the use of a genetic algorithm (GA) to address the scheduling problem is proposed. The scheduling problem is formulated as a mixed integer program. It is noted that the scheduling problem is NP-hard and the computational effort required to solve even small-scale test problems is prohibitively large. A crossover scheme has been developed for the proposed GA. Computational experiments are carried out to compare the performance of the proposed GA with that of GAs using six popular crossover schemes. Computational results show that the proposed GA performs best, with its solutions on average 4.05% better than the best solutions found by the other six GAs.
引用
收藏
页码:33 / 47
页数:15
相关论文
共 50 条
  • [21] A complete and an incomplete algorithm for automated guided vehicle scheduling in container terminals
    Rashidi, Hassan
    Tsang, Edward P. K.
    [J]. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2011, 61 (03) : 630 - 641
  • [22] Scheduling of Quay Crane at Container Terminals based on Ant Colony Algorithm
    Xiao Jianmei
    Wang Xihuai
    Ouyang Lingping
    [J]. 2011 INTERNATIONAL CONFERENCE ON MACHINE INTELLIGENCE (ICMI 2011), PT 2, 2011, 4 : 586 - 592
  • [23] An exact algorithm for scheduling tandem quay crane operations in container terminals
    Kong, Lingrui
    Ji, Mingjun
    Gao, Zhendi
    [J]. Transportation Research Part E: Logistics and Transportation Review, 2022, 168
  • [24] Genetic mechanism-based coupling algorithm for solving coordinated scheduling problems of yard systems in container terminals
    Liang, Chengji
    Gu, Tianyi
    Lu, Bo
    Ding, Yi
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 89 : 34 - 42
  • [25] A Hybrid Genetic-Heuristic Algorithm for Scheduling of Automated Guided Vehicles and Quay Cranes in Automated Container Terminals
    Homayouni, S. M.
    Tang, S. H.
    Ismail, N.
    Ariffin, M. K. A. M.
    Samin, R.
    [J]. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 96 - 101
  • [26] Quay crane scheduling in container terminals
    Ng, W. C.
    Mak, K. L.
    [J]. ENGINEERING OPTIMIZATION, 2006, 38 (06) : 723 - 737
  • [27] Review on integrated scheduling of container terminals
    Chang, Yi-Mei
    Zhu, Xiao-Ning
    Wang, Li
    [J]. Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2019, 19 (01): : 136 - 146
  • [28] Scheduling reefer mechanics at container terminals
    Hartmann, Soenke
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2013, 51 : 17 - 27
  • [29] Determining the optimal number of yard trucks in smaller container terminals
    Stojakovic, Maja
    Twrdy, Elen
    [J]. EUROPEAN TRANSPORT RESEARCH REVIEW, 2021, 13 (01)
  • [30] An improved Ant Colony Optimization Algorithm for tugboat scheduling planning in container terminals
    Wang, Su
    Meng, Bo
    [J]. FIFTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS 1-3: INTEGRATION AND INNOVATION THROUGH MEASUREMENT AND MANAGEMENT, 2006, : 872 - 879