Multi-fuel multi-product operation of IGCC power plants with carbon capture and storage (CCS)

被引:63
|
作者
Cormos, Ana-Maria [1 ]
Dinca, Cristian [2 ]
Cormos, Calin-Cristian [1 ]
机构
[1] Univ Babes Bolyai, Fac Chem & Chem Engn, RO-400028 Cluj Napoca, Romania
[2] Politehn Univ, Fac Power Engn, RO-060042 Bucharest, Romania
关键词
Gasification; Coal & biomass co-processing; Energy vectors poly-generation; Hydrogen & power co-generation; Carbon capture and storage (CCS); GASIFICATION;
D O I
10.1016/j.applthermaleng.2013.12.080
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper investigates multi-fuel multi-product operation of IGCC plants with carbon capture and storage (CCS). The investigated plant designs co-process coal with different sorts of biomass (e.g. sawdust) and solid wastes, through gasification, leading to different decarbonised energy vectors (power, hydrogen, heat, substitute natural gas etc.) simultaneous with carbon capture. Co-gasification of coal with different renewable energy sources coupled with carbon capture will pave the way towards zero emissions power plants. The energy conversions investigated in the paper were simulated using commercial process flow modelling package (ChemCAD) in order to produce mass and energy balances necessary for the proposed evaluation. As illustrative cases, hydrogen and power co-generation and Fischer-Tropsch fuel synthesis (both with carbon capture), were presented. The case studies investigated in the paper produce a flexible ratio between power and hydrogen (in the range of 400-600 MW net electricity and 0-200 MWth hydrogen considering the lower heating value) with at least 90% carbon capture rate. Special emphasis were given to fuel selection criteria for optimisation of gasification performances (fuel blending), to the selection criteria for gasification reactor in a multi-fuel multi-product operation scenario, modelling and simulation of whole process, to thermal and power integration of processes, flexibility analysis of the energy conversion processes, in-depth techno-economic and environmental assessment etc. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:20 / 27
页数:8
相关论文
共 50 条
  • [31] The promise of carbon capture and storage: evaluating the capture-readiness of new EU fossil fuel power plants
    Graus, Wina
    Roglieri, Mauro
    Jaworski, Piotr
    Alberio, Luca
    Worrell, Ernst
    [J]. CLIMATE POLICY, 2011, 11 (01) : 789 - 812
  • [32] OUTLINE OF MULTI-PRODUCT PLANTS TAKING INTO CONSIDERATION THE DEPENDABILITY OF SYSTEM ELEMENTS
    FAHNER, J
    NEUMANN, W
    [J]. CHEMISCHE TECHNIK, 1984, 36 (08): : 347 - 348
  • [33] The potential of advanced technologies to reduce carbon capture costs in future IGCC power plants
    Klara, Julianne M.
    Plunkett, John E.
    [J]. INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2010, 4 (02) : 112 - 118
  • [34] The potential of advanced technologies to reduce carbon capture costs in future IGCC power plants
    Klara, Julianne M.
    [J]. GREENHOUSE GAS CONTROL TECHNOLOGIES 9, 2009, 1 (01): : 3827 - 3834
  • [35] Carbon Dioxide Capture and Storage (CCS) at Coal-Fired Power Plants Does Not Contribute to Stopping Climate Change
    Luhmann, Hans-Jochen
    [J]. GAIA-ECOLOGICAL PERSPECTIVES FOR SCIENCE AND SOCIETY, 2009, 18 (04): : 294 - 299
  • [36] Coordination optimization in multi-product and multi-objective supply chains considering carbon emission
    Zhang, Mingwei
    Qu, Xiaolong
    Li, Bo
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2018, 24 (04): : 1024 - 1033
  • [37] Rule-based scheduling of multi-stage multi-product batch plants with parallel units
    Shi, Bin
    Qian, Xinrui
    Sun, Shanshan
    Yan, Liexiang
    [J]. CHINESE JOURNAL OF CHEMICAL ENGINEERING, 2017, 25 (08) : 1022 - 1036
  • [38] A comparison of carbon monoxide levels during the use of a multi-fuel camp stove
    Schwartz, RB
    Ledrick, DJ
    Lindman, AL
    [J]. WILDERNESS & ENVIRONMENTAL MEDICINE, 2001, 12 (04) : 236 - 238
  • [39] Rule-based scheduling of multi-stage multi-product batch plants with parallel units
    Bin Shi
    Xinrui Qian
    Shanshan Sun
    Liexiang Yan
    [J]. Chinese Journal of Chemical Engineering, 2017, 25 (08) : 1022 - 1036
  • [40] Scheduling of multi-product batch plants based upon timed automata models
    Panek, Sebastian
    Engell, Sebastian
    Subbiah, Subanatarajan
    Stursberg, Olaf
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (1-2) : 275 - 291