共 50 条
- [46] Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (7-8): : 810 - 821
- [48] Two-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 2006, 33 (02): : 233 - 252
- [49] A HEURISTIC APPROACH TO MINIMISING MAXIMUM LATENESS ON A SINGLE MACHINE SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 26 (03): : 41 - 53
- [50] Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups The International Journal of Advanced Manufacturing Technology, 2009, 43 : 810 - 821