BIM-based estimation of inputs for site layout planning and locating irregularly shaped facilities

被引:3
|
作者
Zavari, Masoud [1 ]
Shahhosseini, Vahid [1 ]
Ardeshir, Abdollah [1 ]
Sebt, Mohammad Hassan [1 ]
机构
[1] Amirkabir Univ Technol, Dept Civil & Environm Engn, 350 Hafez Ave,Valiasr Sq, Tehran, Iran
关键词
Construction site layout planning (CSLP); Building Information Modeling (BIM); Congested sites; Input parameters; Facility setup algorithm; Non-dominated Sorting Genetic Algorithm II (NSGA-II); CONSTRUCTION SITE; OPTIMIZATION; ALGORITHM; FRAMEWORK; SYSTEM; MODEL;
D O I
10.1016/j.autcon.2022.104431
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Although construction site layout planning (CSLP) is a significant step in construction planning that has a direct impact on the project performance, its input parameters are mainly obtained by asking site managers and related contractors. The dynamic environment, complexities, and uncertainties of a construction project cause a reduction in the precision of these inputs. This study aims to enhance the CSLP precision by providing a holistic and practical method for estimating these parameters. For this intention, a database is established using the data obtained from the project schedule and BIM to allow the calculation of the input parameters. A new algorithm for facility setup is also proposed for optimizing the facility's shape, which seems beneficial in congested sites where space becomes a limited resource. A case study demonstrates the practicality and functionality of the method. The facility setup algorithm also causes an improvement over restricting facilities to regular shapes.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] A BIM-based dynamic model for site material supply
    Yu, Qunzhou
    Li, Kaiman
    Luo, Hanbin
    [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 526 - 533
  • [22] BIM-BASED PROTOTYPE OF A MATHEMATICAL MODEL OF CONSTRUCTION PLANNING
    Kontrimovicius, Robertas
    Ustinovichius, Leonas
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2023, 29 (01) : 1 - 14
  • [23] Integrating BIM and VR for Highway Construction Site Layout Planning
    Xu, Sheng
    Fu, Denglin
    Xie, Yuanfang
    Hou, Lei
    Bu, Shanshan
    [J]. CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 1068 - 1079
  • [24] A BIM-based space-oriented solution for hospital facilities management
    Wen, Ya
    Tang, Llewellyn C. M.
    Ho, Daniel C. W.
    [J]. FACILITIES, 2021, 39 (11-12) : 689 - 702
  • [25] Research on BIM-Based Assembly Sequence Planning of Prefabricated Buildings
    Wang, Yaowu
    Yuan, Zhenmin
    [J]. ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 10 - 17
  • [26] BIM-Based Framework for Formwork Planning Considering Potential Reuse
    Mei, Zhongya
    Xu, Maozeng
    Wu, Peng
    Luo, Siyu
    Wang, Jun
    Tan, Yi
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (02)
  • [27] BIM-based photovoltaic power station automation layout and power generation evaluation
    Ding J.
    Bai J.
    Li J.
    Wang Y.
    Jiang M.
    Niu Y.
    [J]. Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2022, 43 (05): : 305 - 311
  • [28] BIM-Based Decision-Making Framework for Scaffolding Planning
    Kim, Kyungki
    Cho, Yong K.
    Kim, Kinam
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (06)
  • [29] BIM-based scan planning for scanning with a quadruped walking robot
    Park, Sangyoon
    Yoon, Sanghyun
    Ju, Sungha
    Heo, Joon
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 152