BIM-based estimation of inputs for site layout planning and locating irregularly shaped facilities

被引:3
|
作者
Zavari, Masoud [1 ]
Shahhosseini, Vahid [1 ]
Ardeshir, Abdollah [1 ]
Sebt, Mohammad Hassan [1 ]
机构
[1] Amirkabir Univ Technol, Dept Civil & Environm Engn, 350 Hafez Ave,Valiasr Sq, Tehran, Iran
关键词
Construction site layout planning (CSLP); Building Information Modeling (BIM); Congested sites; Input parameters; Facility setup algorithm; Non-dominated Sorting Genetic Algorithm II (NSGA-II); CONSTRUCTION SITE; OPTIMIZATION; ALGORITHM; FRAMEWORK; SYSTEM; MODEL;
D O I
10.1016/j.autcon.2022.104431
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Although construction site layout planning (CSLP) is a significant step in construction planning that has a direct impact on the project performance, its input parameters are mainly obtained by asking site managers and related contractors. The dynamic environment, complexities, and uncertainties of a construction project cause a reduction in the precision of these inputs. This study aims to enhance the CSLP precision by providing a holistic and practical method for estimating these parameters. For this intention, a database is established using the data obtained from the project schedule and BIM to allow the calculation of the input parameters. A new algorithm for facility setup is also proposed for optimizing the facility's shape, which seems beneficial in congested sites where space becomes a limited resource. A case study demonstrates the practicality and functionality of the method. The facility setup algorithm also causes an improvement over restricting facilities to regular shapes.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] BIM-based estimation of inputs for site layout planning and locating irregularly shaped facilities
    Zavari, Masoud
    Shahhosseini, Vahid
    Ardeshir, Abdollah
    Sebt, Mohammad Hassan
    [J]. AUTOMATION IN CONSTRUCTION, 2022, 141
  • [2] BIM-based Site Layout and Safety Planning
    Sulankivi, Kristiina
    Makela, Tarja
    Kiviniemi, Markku
    [J]. FIRST INTERNATIONAL CONFERENCE ON IMPROVING CONSTRUCTION AND USE THROUGH INTEGRATED DESIGN SOLUTIONS, 2009, 259 : 125 - +
  • [3] A BIM-Based Approach to Automated Prefabricated Building Construction Site Layout Planning
    Yang, Bin
    Fang, Tengwei
    Luo, Xiaoqun
    Liu, Boda
    Dong, Miaosi
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (04) : 1535 - 1552
  • [4] A BIM-based automated site layout planning framework for congested construction sites
    Kumar, Srinath S.
    Cheng, Jack C. P.
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 59 : 24 - 37
  • [5] A BIM-Based Approach to Automated Prefabricated Building Construction Site Layout Planning
    Bin Yang
    Tengwei Fang
    Xiaoqun Luo
    Boda Liu
    Miaosi Dong
    [J]. KSCE Journal of Civil Engineering, 2022, 26 : 1535 - 1552
  • [6] BIM-based framework for temporary facility layout planning in construction site A hybrid approach
    Phuoc Luong Le
    Thien-My Dao
    Chaabane, Amin
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2019, 19 (03): : 424 - 464
  • [7] A BIM-based approach for automated tower crane layout planning
    Wang, Jun
    Zhang, Xuedong
    Shou, Wenchi
    Wang, Xiangyu
    Xu, Bo
    Kim, Mi Jeong
    Wu, Peng
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 59 : 168 - 178
  • [8] A BIM-based system for demolition and renovation waste estimation and planning
    Cheng, Jack C. P.
    Ma, Lauren Y. H.
    [J]. WASTE MANAGEMENT, 2013, 33 (06) : 1539 - 1551
  • [9] BIM-based Applications of Metaheuristic Algorithms to Support the Decision-making Process: Uses in the Planning of Construction Site Layout
    Amiri, Roya
    Sardroud, Javad Majrouhi
    de Soto, Borja Garcia
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 558 - 564
  • [10] BIM-Based Campus Spatial Planning
    Wang, Kun-Chi
    Hsu, Liang-Yu
    Chen, Guan-Yu
    Wu, Sheng-Min
    [J]. PROCEEDINGS OF THE 3RD IEEE INTERNATIONAL CONFERENCE ON ARCHITECTURE, CONSTRUCTION, ENVIRONMENT AND HYDRAULICS 2021, 2021, : 39 - 43