共 50 条
- [41] STUDY ON THE CONSTRUCTION PROJECT PROCUREMENT METHOD BASED ON THE THEORY OF LEAN CONSTRUCTION [J]. PROCEEDINGS OF THE SECOND INTERNATIONAL POSTGRADUATE CONFERENCE ON INFRASTRUCTURE AND ENVIRONMENT, VOL 1, 2010, : 300 - 307
- [42] Lean Construction Practice on Toll Road Project Improvement: A Case Study in Developing Country [J]. CIVIL ENGINEERING JOURNAL-TEHRAN, 2023, 9 (12): : 3186 - 3201
- [43] IMPLEMENTATION OF THE MOCIRE COMPLEX CONSTRUCTION PROJECT Project management in the initial phase [J]. GRADEVINAR, 2019, 71 (11): : 1084 - 1088
- [46] Succeeding with Building Information Modeling: A Case Study of BIM Diffusion in a Healthcare Construction Project [J]. 2014 47TH HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES (HICSS), 2014, : 3959 - 3968
- [47] Evaluation of lean construction practices for improving construction project delivery. Case study of Bushenyi District, Uganda [J]. COGENT ENGINEERING, 2024, 11 (01):
- [49] Concurrency in BIM-Based Project Implementation: An Exploratory Study of Chongqing Jiangbei International Airport's Terminal 3A [J]. COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING, CDVE 2016, 2016, 9929 : 257 - 262
- [50] A study on BIM implementation of construction projects for PCM during the construction phase [J]. Journal of the Chinese Institute of Civil and Hydraulic Engineering, 2020, 32 (02): : 239 - 250