The dam of the HPP Mariborski otok on the Drava River, Slovenia was constructed in the last half of the forties of this century. At the beginning of the operation, the care of safety was limited to maintenance procedures and based mostly on visual observation of the dam. In the last twenty years, a regular monitoring system was introduced and used to observe the behavior of the structure and accumulation. Permanent periodic visual inspections, combined with surveying of vertical and horizontal displacements and piezometric measurements of the uplift pressures were introduced in the early seventies. In the year 1990 the refurbishment of HPP and uprating of the electro-mechanical equipment started At the same time, this was also an occasion for more complete safety analysis of the clam structure. The paper presents the procedure used for safety assessment of the existing dam. The statistic arm deterministic numerical models based on the measured data have been used. The results show satisfactory "condition" of the fifty years old dam at normal static loads. The earthquake analysis was introduced by means of pseudo-static loads. The dynamic anal ais has mot been performed. Such an analysis would be necessary, to complete the dam safety picture, particularly in some load cases where the results of the safety against sliding approached the minimum requested values.
引用
收藏
页码:444 / 453
页数:10
相关论文
共 50 条
  • [21] Australian practice in Dam safety Risk Assessment
    Fell, R
    [J]. REDUCING RISK FROM EXTREME EVENTS, 2003, : 1 - 21
  • [22] PROBABLE MAXIMUM FLOOD FOR DAM SAFETY ASSESSMENT
    C.F.LEE( Geotechnical and Hydraulic Engineering Department
    Manager of Civil Engineering and Architecture Department
    [J]. International Journal of Sediment Research, 1996, (02) : 56 - 68
  • [23] Comprehensive assessment method for large dam safety
    He Jinping
    Shi Yuqun
    Luo Guhuai
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 6, PTS A AND B, 2006, 6 : 2351 - 2355
  • [24] Risk assessment approach to dam safety criteria
    Bowles, DS
    Anderson, LR
    Glover, TF
    [J]. UNCERTAINTY IN THE GEOLOGIC ENVIRONMENT: FROM THEORY TO PRACTICE, VOLS 1 AND 2: PROCEEDINGS OF UNCERTAINTY '96, 1996, (58): : 451 - 473
  • [25] A role for risk assessment in dam safety management
    Bowles, DS
    Anderson, LR
    Glover, TF
    [J]. HYDROPOWER '97, 1997, : 359 - 367
  • [26] Safety reviews of existing roads - Quantitative safety assessment methodology
    Montella, A
    [J]. SAFETY: OLDER DRIVERS; TRAFFIC LAW ENFORCEMENT; MANAGEMENT; SCHOOL TRANSPORTATION; EMERGENCY EVACUATION; TRUCK AND BUS; AND MOTORCYCLES, 2005, (1922): : 62 - 72
  • [27] Operation of the dam of the Bureiskaya HPP during filling of the reservoir
    Durcheva V.N.
    Puchkova S.M.
    [J]. Power Technology and Engineering, 2006, 40 (2) : 71 - 78
  • [28] Experience of grouting works in the bed of the Bureya HPP dam
    Argal É.S.
    Kudrin K.P.
    Tuzhikhin G.G.
    [J]. Power Technology and Engineering, 2005, 39 (6) : 319 - 323
  • [29] Comprehensive Assessment of Dam Safety Using a Game-Theory-Based Dam Safety Performance Measure
    Fu, Zhijun
    Feng, Peng
    Luo, Zhu
    [J]. WATER, 2024, 16 (05)
  • [30] A fire safety assessment system for existing buildings
    Lo, SM
    [J]. FIRE TECHNOLOGY, 1999, 35 (02) : 131 - 152