The Millau cable-stayed bridge

被引:0
|
作者
Virlogeux, M
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The erection of the viaduct over the Tarn River, at Millau in central france began in October 2001 and is scheduled for completion in January 2005. This is a major step for-ward in the design of cable-stayed bridges, with a series of six main spans, 342 meters long, suspended from seven pylons. The roadway is 270 meters above the river, and two of the piers will be approximately 235 meters tall. With the corresponding pylons 90 meters tall, they will be higher than the Eiffel tower. Two designs have been developed, one in prestressed concrete and one in steel. This paper summarizes the history of the Millau Viaduct Project.
引用
收藏
页码:3 / 18
页数:16
相关论文
共 50 条
  • [31] Research on Structure design of Cable-stayed Bridge
    Li, Xi
    Cai, Tingting
    [J]. SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2565 - 2569
  • [32] Second Severn crossing - cable-stayed bridge
    Mizon, DH
    Smith, N
    Yeoward, AJ
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1997, 120 : 49 - 63
  • [33] Replacement of the stays on a major cable-stayed bridge
    Sandberg, J.
    Hendy, C. R.
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2010, 163 (01) : 31 - 42
  • [34] Global analysis of the SuTong cable-stayed bridge
    Miao, Jiawu
    Xiao, Rucheng
    Pei, Minshan
    Zhang, Xigang
    Pircher, Martin
    Janjic, Dorian
    [J]. IABSE Conference New Delhi, India 2005: ROLE OF STRUCTURAL ENGINEERS TOWARDS REDUCTION OF POVERTY, 2005, : 343 - 348
  • [35] CABLE-STAYED BRIDGE CROSSES THE MISSISSIPPI.
    Anon
    [J]. Welding Design and Fabrication, 1984, 57 (06): : 67 - 70
  • [36] Initial thoughts on the design of a cable-stayed bridge
    Hunt, I
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 1997, 122 (02) : 218 - 226
  • [37] Dynamic tests on large cable-stayed bridge
    Cunha, A.
    Caetano, E.
    Delgado, R.
    [J]. Journal of Bridge Engineering, 2001, 6 (01) : 54 - 62
  • [38] Behavior of a multiple spans cable-stayed bridge
    Arnaud, S.
    Matsunaga, N.
    Nagano, S.
    Ragaru, J. -P.
    [J]. TAILOR MADE CONCRETE STRUCTURES: NEW SOLUTIONS FOR OUR SOCIETY, 2008, : 176 - 176
  • [39] Dynamic study of the Barqueta cable-stayed bridge
    Escuela Superior de Ingenieros, Universidad de Sevilla, Camino de los Descubrimientos s/n, 41092 Seville, Spain
    [J]. Conf. Proc. Soc. Exp. Mech. Ser.,
  • [40] Veering phenomena in cable-stayed bridge dynamics
    Gattulli, V.
    Nicolucci, L.
    Lepidi, M.
    [J]. Structural Dynamics - EURODYN 2005, Vols 1-3, 2005, : 1113 - 1118