Capacitated multi-objective disassembly scheduling with fuzzy processing time via a fruit fly optimization algorithm

被引:29
|
作者
Yuan, Gang [1 ,2 ]
Yang, Yinsheng [1 ]
Tian, Guangdong [3 ]
Fathollahi-Fard, Amir M. [4 ]
机构
[1] Jilin Univ, Coll Biol & Agr Engn, Changchun 130022, Peoples R China
[2] Natl Univ Singapore, Dept Ind Syst Engn & Management, Singapore 119077, Singapore
[3] Shandong Univ, Sch Mech Engn, Key Lab High Efficiency & Clean Mech Manufacture, Minist Educ, Jinan 250061, Peoples R China
[4] Univ Quebec, Dept Elect Engn, Ecole Technol Super, Montreal, PQ, Canada
基金
中国国家自然科学基金;
关键词
Disassembly; Scheduling; Remanufacturing; Fruit fly algorithm; Fuzzy processing time; RANDOM YIELDS; ORDER; MODEL; PRODUCTS; PARTS;
D O I
10.1007/s11356-022-18883-y
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This work proposes a capacitated fuzzy disassembly scheduling model with cycle time and environmental cost as parameters, which has broad applications in remanufacturing and many other production systems. Disassembly scheduling is not always given accurately as a time quota in a production system, particularly in the obsolete product remanufacturing process. It is important to study novel models and algorithms based on uncertainty processing time to solve uncertainty disassembly scheduling problems. In this paper, a mixed-integer mathematical programming model is proposed to minimize the cycle time and environmental cost, whilst a metaheuristic approach based on a fruit fly optimization algorithm (FOA) is developed to find a fuzzy disassembly scheduling scheme. To estimate the effectiveness of the proposed method, the proposed algorithm is tested with different size cases of product disassembly scheduling. Furthermore, experiments are conducted to compare with other multi-objective optimization algorithms. The computational results demonstrate the proposed algorithm outperforms other algorithms on computational efficiency and applicability to different problems. Finally, a case study is described to illustrate the proposed method. The main contribution of this current work shows the proposed algorithm to solve the problem of disassembly scheduling in an uncertain environment practically and efficiently.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] A new container scheduling algorithm based on multi-objective optimization
    Liu, Bo
    Li, Pengfei
    Lin, Weiwei
    Shu, Na
    Li, Yin
    Chang, Victor
    SOFT COMPUTING, 2018, 22 (23) : 7741 - 7752
  • [22] Fuzzy programming approach for a multi-objective single machine scheduling problem with stochastic processing time
    Mahdavi, Iraj
    Javadi, Babak
    Tajdin, Ali
    WORLD CONGRESS ON ENGINEERING 2008, VOLS I-II, 2008, : 1302 - +
  • [23] RESEARCH ON INTELLIGENT OPTIMIZATION ALGORITHM FOR MULTI-OBJECTIVE DISASSEMBLY LINE BALANCING PROBLEM
    Xu, Yunli
    Yao, Bitao
    Duc Truong Pham
    PROCEEDINGS OF THE ASME 2020 15TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE (MSEC2020), VOL 2B, 2020,
  • [24] A multi-objective algorithm for task scheduling and resource allocation in cloud-based disassembly
    Jiang, Hui
    Yi, Jianjun
    Chen, Shaoli
    Zhu, Xiaomin
    JOURNAL OF MANUFACTURING SYSTEMS, 2016, 41 : 239 - 255
  • [25] Optimization of disassembly line balancing using an improved multi-objective Genetic Algorithm
    Wang, Y. J.
    Wang, N. D.
    Cheng, S. M.
    Zhang, X. C.
    Liu, H. Y.
    Shi, J. L.
    Ma, Q. Y.
    Zhou, M. J.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2021, 16 (02): : 240 - 252
  • [26] The Fourth Party Logistics (4PL) Optimization Analysis Based on Multi-Objective Fruit Fly Optimization Algorithm
    Yin, Qing
    Liu, Gang
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2020, 126 : 245 - 245
  • [27] Cooperative capture trajectory optimization of multi-space robots using an improved multi-objective fruit fly algorithm
    Wang, Yong
    Cao, Jing
    Ye, Nan
    Sun, Shouming
    Li, Junfeng
    Bo, Zhenyong
    OPEN ASTRONOMY, 2022, 31 (01) : 405 - 416
  • [28] A Fuzzy Simulated Evolution Algorithm for Multi-Objective Homecare Worker Scheduling
    Mutingi, M.
    Mbohwa, C.
    2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 586 - 590
  • [29] Improved Genetic Algorithm of Multi-objective Structure Fuzzy Optimization
    Lai, Yinan
    Lai, Mingzhu
    You, Bindi
    Dimitrov, Todorov Georgi
    FIFTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 1, PROCEEDINGS, 2008, : 306 - 310
  • [30] A Fuzzy Multi-objective Optimization Algorithm in Mine Ore Blending
    Li, Liang
    Xu, Tiejun
    Liu, Zhiqiang
    INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 2, PROCEEDINGS, 2009, : 773 - +