Capacitated multi-objective disassembly scheduling with fuzzy processing time via a fruit fly optimization algorithm

被引:26
|
作者
Yuan, Gang [1 ,2 ]
Yang, Yinsheng [1 ]
Tian, Guangdong [3 ]
Fathollahi-Fard, Amir M. [4 ]
机构
[1] Jilin Univ, Coll Biol & Agr Engn, Changchun 130022, Peoples R China
[2] Natl Univ Singapore, Dept Ind Syst Engn & Management, Singapore 119077, Singapore
[3] Shandong Univ, Sch Mech Engn, Key Lab High Efficiency & Clean Mech Manufacture, Minist Educ, Jinan 250061, Peoples R China
[4] Univ Quebec, Dept Elect Engn, Ecole Technol Super, Montreal, PQ, Canada
基金
中国国家自然科学基金;
关键词
Disassembly; Scheduling; Remanufacturing; Fruit fly algorithm; Fuzzy processing time; RANDOM YIELDS; ORDER; MODEL; PRODUCTS; PARTS;
D O I
10.1007/s11356-022-18883-y
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This work proposes a capacitated fuzzy disassembly scheduling model with cycle time and environmental cost as parameters, which has broad applications in remanufacturing and many other production systems. Disassembly scheduling is not always given accurately as a time quota in a production system, particularly in the obsolete product remanufacturing process. It is important to study novel models and algorithms based on uncertainty processing time to solve uncertainty disassembly scheduling problems. In this paper, a mixed-integer mathematical programming model is proposed to minimize the cycle time and environmental cost, whilst a metaheuristic approach based on a fruit fly optimization algorithm (FOA) is developed to find a fuzzy disassembly scheduling scheme. To estimate the effectiveness of the proposed method, the proposed algorithm is tested with different size cases of product disassembly scheduling. Furthermore, experiments are conducted to compare with other multi-objective optimization algorithms. The computational results demonstrate the proposed algorithm outperforms other algorithms on computational efficiency and applicability to different problems. Finally, a case study is described to illustrate the proposed method. The main contribution of this current work shows the proposed algorithm to solve the problem of disassembly scheduling in an uncertain environment practically and efficiently.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Stochastic multi-objective integrated disassembly-reprocessing-reassembly scheduling via fruit fly optimization algorithm
    Fu, Yaping
    Zhou, MengChu
    Guo, Xiwang
    Qi, Liang
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 278
  • [2] Hybrid collaborative multi-objective fruit fly optimization algorithm for scheduling workflow in cloud environment
    Qin, Shuo
    Pi, Dechang
    Shao, Zhongshi
    Xu, Yue
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2022, 68
  • [3] Multi-objective genetic algorithm for integrated process planning and scheduling with fuzzy processing time
    Wen, Xiaoyu
    Li, Xinyu
    Gao, Liang
    Wan, Liang
    Wang, Wenwen
    [J]. 2013 SIXTH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTATIONAL INTELLIGENCE (ICACI), 2013, : 293 - 298
  • [4] Multi-objective optimization method of remanufacturing reprocessing shop scheduling with fuzzy processing time
    Guo, Jun
    Zhong, Jing-Cheng
    Du, Bai-Gang
    Wu, Rui
    Li, Yi-Bing
    [J]. Kongzhi yu Juece/Control and Decision, 2020, 35 (06): : 1497 - 1504
  • [5] Multi-objective Fruit Fly Optimization Algorithm for Test Point Selection
    Ma, Qingfeng
    He, Yuzhu
    Zhou, Fuqiang
    [J]. PROCEEDINGS OF 2016 IEEE ADVANCED INFORMATION MANAGEMENT, COMMUNICATES, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IMCEC 2016), 2016, : 272 - 276
  • [6] Integrated Optimization of Workshop Layout and Scheduling to Reduce Carbon Emissions Based on a Multi-objective Fruit Fly Optimization Algorithm
    State Key Laboratory of Digital Manufacturing Equipment & Technology, Huazhong University of Science and Technology, Wuhan
    430074, China
    [J]. Jixie Gongcheng Xuebao, 11 (122-133):
  • [7] A green train scheduling model and fuzzy multi-objective optimization algorithm
    Li, Xiang
    Wang, Dechun
    Li, Keping
    Gao, Ziyou
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (04) : 2063 - 2073
  • [8] Multi-objective optimization for fuzzy workflow scheduling
    Zhu, Jie
    Zhang, Jing
    Lu, Chang
    Huang, Haiping
    [J]. 2021 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2021, : 2800 - 2805
  • [9] Energy-efficient multi-objective scheduling algorithm for hybrid flow shop with fuzzy processing time
    Zhou, Binghai
    Liu, Wenlong
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART I-JOURNAL OF SYSTEMS AND CONTROL ENGINEERING, 2019, 233 (10) : 1282 - 1297
  • [10] A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem
    Wang, Ling
    Zheng, Xiao-long
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2018, 38 : 54 - 63