Data requirements and communication issues for advanced process control

被引:2
|
作者
Markle, RJ [1 ]
Coss, E [1 ]
机构
[1] Adv Micro Devices Inc, Austin, TX 78741 USA
关键词
Control equipment - Data communication systems - Data processing - Error detection - Measurements - Quality control - Reliability;
D O I
10.1116/1.1380225
中图分类号
TB3 [工程材料学];
学科分类号
0805 ; 080502 ;
摘要
Data streams and communication issues are the most critical areas for successful advanced process control (APC) programs. These areas are vital for both APC run-to-run controllers and fault detection and classification (FDC) systems used for high volume manufacturing applications in the semiconductor industry. All APC systems rely on data streams to make their process changes, to keep the process on target and in control, and to otherwise signal a need for engineering involvement to make similar corrective actions. The access to, communication of, and reliability and integrity of these data streams are essential to all APC programs. APC run-to-run controllers use the data to make changes in the process. FDC systems focus on predicting pending equipment- or process-related problems or detecting them quickly when they occur. The inability to access the needed data stream can prohibit the use of APC run-to-run controllers or FDC systems on critical process operations. Worse yet, the use of unreliable or corrupted data can cause undesirable consequences. In order to better capitalize on the improvements demonstrated with APC run-to-run controllers and FDC systems, end users have often had to create their own communication and data processing methods. The first decade of the 21st century will place increased demands on process and metrology equipment manufacturers, APC software and hardware suppliers, and APC programmers. Improvements in these areas through the use of industry standards and best known methods could greatly accelerate the APC field. Wafer-to-wafer and within wafer process control could be essential for 300 mm wafer processing; large flat panel processing will also need these improvements. We will discuss examples that Advanced Micro Devices experienced in Fast atom beam-25 within the past year. The case studies relate to complex, but necessary, methods to get the data we need for a FDC system and the role of metrology data on APC run-to-run controllers. Data and communication requirements for the next three to five years will also be discussed. The increased demands on the current process and metrology systems will increase as we begin to use new and alternative technologies to support more advanced APC strategies. (C) 2001 American Vacuum Society.
引用
收藏
页码:1241 / 1247
页数:7
相关论文
共 50 条
  • [21] PLANT INFORMATION AND ADVANCED PROCESS-CONTROL SYSTEMS THE ISSUES AND ONE REFINERY PATH
    WOODLAND, BJ
    ADVANCES IN INSTRUMENTATION AND CONTROL, VOL 44, PT 1-4, 1989, 44 : 187 - 196
  • [22] TRIBOLOGICAL DATA REQUIREMENTS FOR PROCESS MODELING
    MALE, AT
    JOURNAL OF METALS, 1980, 32 (08): : 62 - 62
  • [23] DESIGN DATA REQUIREMENTS IN THE PROCESS INDUSTRIES
    MADDEN, J
    TAYLOR, VT
    COMPUTER-AIDED DESIGN, 1979, 11 (03) : 142 - 145
  • [24] Big Data Capabilities Applied to Semiconductor Manufacturing Advanced Process Control
    Moyne, James
    Samantaray, Jamini
    Armacost, Michael
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2016, 29 (04) : 283 - 291
  • [25] Next Generation Advanced Process Control: Leveraging Big Data and Prediction
    Moyne, James
    Schulze, Brad
    Iskandar, Jimmy
    Armacost, Michael
    2016 27TH ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC), 2016, : 191 - 196
  • [26] Neural Network Modeling for Advanced Process Control Using Production Data
    Mevawalla, Zubin N.
    May, Gary S.
    Kiehlbauch, Mark W.
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2011, 24 (02) : 182 - 189
  • [27] Advanced process control: Benefits for photolithography process control
    Gould, C
    2002 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP: ADVANCING THE SCIENCE OF SEMICONDUCTOR MANUFACTURING EXCELLENCE, 2002, : 98 - 100
  • [28] Realizing the Value of Big Data in Process Monitoring and Control: Current Issues and Opportunities
    Rubab, Saddaf
    Taqvi, Syed A.
    Hassan, Mohd Fadzil
    RECENT TRENDS IN DATA SCIENCE AND SOFT COMPUTING, IRICT 2018, 2019, 843 : 128 - 138
  • [29] Advanced categorical statistics: Issues and applications in communication research
    Denham, BE
    JOURNAL OF COMMUNICATION, 2002, 52 (01) : 162 - 176
  • [30] REQUIREMENTS FOR PROCESS CONTROL MANAGMENT AND MAINTENANCE
    POWELL, JK
    PULP AND PAPER MAGAZINE OF CANADA, 1970, 71 (09): : 41 - &