Multicriteria assessment of unfinished construction projects

被引:0
|
作者
Lazauskas, Marius [1 ]
Kutut, Vladislavas [1 ]
Zavadskas, Edmundas Kazimieras [1 ]
机构
[1] Vilnius Gediminas Tech Univ, Vilnius, Lithuania
来源
GRADEVINAR | 2015年 / 67卷 / 04期
关键词
unfinished buildings; AHP; ARAS; MOORA; MULTIMOORA; construction projects; DECISION-MAKING; AHP; MODEL; ALTERNATIVES; MULTIMOORA; ARAS;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Possible ways for assessing completion of unfinished residential buildings to achieve appropriate construction project objectives are presented in the paper. The developed model enables an efficient assessment of unfinished projects in Vilnius, the capital of Lithuania. Unfinished building solutions, expressed through indicators, were selected and used to formulate a multicriteria task to be solved by combinations of methods AHP+ARAS, MOORA and MULTIMOORA. A computational model was created and adjusted for a simple and efficient assessment of the adequacy of investment projects in many areas of construction.
引用
收藏
页码:319 / 328
页数:10
相关论文
共 50 条
  • [31] Safety risk assessment in construction projects at Hasanuddin University
    Darwis, A. Muflihah
    Nai'em, M. Furqaan
    Thamrin, Yahya
    Noviponiharwani
    Rahmadani, Suci
    Amin, Fauziah
    GACETA SANITARIA, 2021, 35 : S385 - S387
  • [32] Risk assessment for construction projects of transport infrastructure objects
    Titarenko, Boris
    ENERGY MANAGEMENT OF MUNICIPAL TRANSPORTATION FACILITIES AND TRANSPORT (EMMFT 2017), 2017, 90
  • [33] Risk-Informed Performance Assessment of Construction Projects
    Papanikolaou, Merkourios
    Xenidis, Yiannis
    SUSTAINABILITY, 2020, 12 (13)
  • [34] Assessment model on environmental economics for construction projects in Korea
    Kwon, Suk-Hyun
    Kim, Kyong Ju
    Kim, Kyoungmin
    Cho, Namho
    KSCE JOURNAL OF CIVIL ENGINEERING, 2012, 16 (04) : 505 - 516
  • [35] Risk Assessment of Construction Organization Plans for Bridge Projects
    Wang, Yuqian
    Bian, Guoyan
    Li, Yi
    ADVANCES IN CIVIL ENGINEERING AND BUILDING MATERIALS III, 2014, 831 : 370 - +
  • [36] Cost assessment of construction projects through neural networks
    Gulcicek, Umit
    Ozkan, Omer
    Gunduz, Murat
    Demir, Ismail Hakki
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2013, 40 (06) : 574 - 579
  • [37] Risk Assessment and Allocation in Highway Construction Projects in the UAE
    El-Sayegh, Sameh M.
    Mansour, Mahmoud H.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
  • [38] Structural Network Measures for Risk Assessment of Construction Projects
    Govan, Paul
    Damnjanovic, Ivan
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2020, 6 (01)
  • [39] Risk identification and assessment in sustainable construction projects in the UAE
    El-Sayegh, Sameh M.
    Manjikian, Solair
    Ibrahim, Ahmed
    Abouelyousr, Ahmed
    Jabbour, Raed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (04) : 327 - 336
  • [40] ENTERPRISE'S RISK ASSESSMENT OF COMPLEX CONSTRUCTION PROJECTS
    Konior, J.
    ARCHIVES OF CIVIL ENGINEERING, 2015, 61 (03) : 63 - 74