Stackelberg game model for construction waste disposal network design

被引:10
|
作者
Yao, Jiaxu [1 ]
Yi, Wen [2 ]
Wang, Haoqing [3 ]
Zhen, Lu [4 ]
Liu, Yannick [3 ]
机构
[1] Univ Tokyo, Dept Civil Engn, Tokyo, Japan
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hung Hom, Hong Kong, Peoples R China
[3] Hong Kong Polytech Univ, Fac Business, Hung Hom, Hong Kong, Peoples R China
[4] Shanghai Univ, Sch Management, Shang Da Rd 99, Shanghai 200444, Peoples R China
基金
中国国家自然科学基金;
关键词
Construction waste management; Construction waste transportation; Construction waste network design; Stackelberg game model; DEMOLITION WASTE; LOGISTICS; UNCERTAINTY;
D O I
10.1016/j.autcon.2022.104573
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Governments and contractors have different goals in handling construction and demolition waste (CDW), which makes it challenging to design CDW recycling networks. This paper develops a Stackelberg game model that governments can use to decide the optimal locations and types of CDW disposal facilities by considering the interests of both the government and contractors. The proposed model is proven to be efficient and practical through a series of real-world case studies. The findings elucidate and manage the different goals of governments and contractors and can help government design an optimal CDW recycling network in practice. Future research could tackle the problem of designing a multiperiod recycling network for managing CDW.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] A Stackelberg game model for construction waste transportation
    Wang, Haoqing
    Yi, Wen
    [J]. ADVANCED ENGINEERING INFORMATICS, 2023, 56
  • [2] Stackelberg Network Interdiction Game: Nodal Model and Algorithm
    Xiao, Kaiming
    Zhu, Cheng
    Zhang, Weiming
    Wei, Xiangyu
    Hu, Songchao
    [J]. 2014 5th International Conference on Game Theory for Networks (GAMENETS), 2014,
  • [3] Construction and demolition waste disposal charging scheme design
    Chen, Xinyuan
    Yi, Wen
    Yuan, Hongping
    Wu, Weiwei
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2024, 39 (02) : 222 - 241
  • [4] An Online Network Price Control Scheme by Using Stackelberg Game Model
    Kim, Sungwook
    [J]. IEICE TRANSACTIONS ON COMMUNICATIONS, 2011, E94B (01) : 322 - 325
  • [5] On construction waste disposal in Chongqing
    廖奇云
    ZHONG Guo-yi
    TAO Yan-yu
    JIA Shun
    [J]. Journal of Chongqing University(English Edition), 2012, 11 (04) : 195 - 202
  • [6] Guidelines for the design, construction, and management of revetments at marine waste disposal facilities
    Ozasa, H
    [J]. REMEDIATION AND BENEFICIAL REUSE OF CONTAMINATED SEDIMENTS, 2002, : 379 - 385
  • [7] A Stackelberg network game with a large number of followers
    Basar, T
    Srikant, R
    [J]. JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 2002, 115 (03) : 479 - 490
  • [8] A Stackelberg Network Game with a Large Number of Followers
    T. Başar
    R. Srikant
    [J]. Journal of Optimization Theory and Applications, 2002, 115 : 479 - 490
  • [9] A cost compensation model for construction and demolition waste disposal in South China
    Liu, Jingkuang
    Teng, Yue
    Jiang, Yuhan
    Gong, Enqin
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2019, 26 (14) : 13773 - 13784
  • [10] A system dynamics model for determining the waste disposal charging fee in construction
    Yuan, Hongping
    Wang, Jiayuan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 237 (03) : 988 - 996