A cost compensation model for construction and demolition waste disposal in South China

被引:24
|
作者
Liu, Jingkuang [1 ]
Teng, Yue [1 ]
Jiang, Yuhan [2 ]
Gong, Enqin [1 ]
机构
[1] Guangzhou Univ, Sch Management, Guangzhou 510006, Guangdong, Peoples R China
[2] Marquette Univ, Construct & Environm Engn, Milwaukee, WI 53233 USA
基金
中国国家自然科学基金;
关键词
C&D waste management; Cost compensation model; Full-cost accounting; SYSTEM DYNAMICS MODEL; WILLINGNESS-TO-PAY; ENVIRONMENTAL PERFORMANCE; ECONOMIC-FEASIBILITY; MANAGEMENT; INCENTIVES; COLLECTION; REDUCTION; SHENZHEN;
D O I
10.1007/s11356-018-2887-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Construction and demolition waste (C&D waste) is a worldwide issue that concerns the sustainable development of the construction industry. In this paper, detailed formulas are listed for calculating the costs of four typical kinds of disposal routes of C&D waste. They are illegal dumping, controlled dumping (landfill), centralized recycling, and on-site recycling. Through the specific formulas, the costs of the new construction project in Guangzhou are also estimated. Then, a cost compensation model of construction waste disposal is constructed, which serves to calculate the amount of compensation that the government shall make to the contractor's disposal cost. The results of this study include the following: (1) steps taken to ensure the appropriate measures for C&D waste disposal sites and recycling centers; (2) the on-site recycling will become the future trend of C&D waste disposal due to its lowest cost; (3) the brick cement mortar and scattered concrete take a relatively larger proportion in the total C&D waste generated during the new construction project, and their disposal costs are higher; (4) we find that the cost of illegal dumping is the lowest among four varieties of waste treatment options if only the direct cost of waste treatment is taken account. However, the cost of on-site recycling becomes the lowest if the total cost is considered; (5) according to the case study, the full estimated cost of construction waste disposal is 9074.56 CNY and the total cost compensation is 15,084.21 CNY. The amount of compensation is greater than the disposal cost and contractors make a profit, thus stimulating them to recycle and reuse construction waste. Based on the empirical findings, we make several policy proposals. The research puts forward some operational advice as a reference for decision-makers of C&D waste management.
引用
收藏
页码:13773 / 13784
页数:12
相关论文
共 50 条
  • [1] A cost compensation model for construction and demolition waste disposal in South China
    Jingkuang Liu
    Yue Teng
    Yuhan Jiang
    Enqin Gong
    [J]. Environmental Science and Pollution Research, 2019, 26 : 13773 - 13784
  • [2] Status Analysis of Building Construction and Demolition Waste Treatment/Disposal and Management in China
    Zhang, Huijuan
    Zhang, Jingjing
    Chen, Sha
    [J]. SUSTAINABLE DEVELOPMENT AND ENVIRONMENT II, PTS 1 AND 2, 2013, 409-410 : 143 - +
  • [3] Construction and demolition waste disposal charging scheme design
    Chen, Xinyuan
    Yi, Wen
    Yuan, Hongping
    Wu, Weiwei
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2024, 39 (02) : 222 - 241
  • [4] Sustainable Management for Construction and Demolition Waste in China
    Yang, Lie
    Chen, Zhulei
    Liu, Ting
    Jiang, Juan
    Gong, Zhe
    [J]. ENERGY, ENVIRONMENT AND ENGINEERING, 2012, 4 : 53 - 59
  • [5] A model for cost-benefit analysis of construction and demolition waste management throughout the waste chain
    Yuan, H. P.
    Shen, L. Y.
    Hao, Jane J. L.
    Lu, W. S.
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2011, 55 (06) : 604 - 612
  • [6] REVERSE LOGISTICS FOR THE ENVIRONMENTALLY SUSTAINABLE DISPOSAL OF CONSTRUCTION AND DEMOLITION WASTE (CDW)
    Silva Santos, Matheus Henrique
    Penteado Marchesini, Marcia Maria
    [J]. REVISTA METROPOLITANA DE SUSTENTABILIDADE, 2018, 8 (02): : 67 - 85
  • [7] Analysis of factors affecting construction and demolition waste safe disposal in Egypt
    Ismail, ElHassan Reda
    El-Mahdy, Ghada Mohamed
    Ibrahim, Ahmed Hussein
    Daoud, Ahmed Osama
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2023, 70 : 515 - 523
  • [8] An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China
    Lu, Weisheng
    Yuan, Hongping
    Li, Jingru
    Hao, Jane J. L.
    Mi, Xuming
    Ding, Zhikun
    [J]. WASTE MANAGEMENT, 2011, 31 (04) : 680 - 687
  • [9] Simulation analysis of implementation effects of construction and demolition waste disposal policies
    Wang, Haizi
    Pan, Xinming
    Zhang, Shibin
    Zhang, Pengfei
    [J]. WASTE MANAGEMENT, 2021, 126 : 684 - 693
  • [10] Development of a hybrid model to predict construction and demolition waste: China as a case study
    Song, Yiliao
    Wang, Yong
    Liu, Feng
    Zhang, Yixin
    [J]. WASTE MANAGEMENT, 2017, 59 : 350 - 361