Optimal distribution feeder reconfiguration and generation scheduling for microgrid day-ahead operation in the presence of electric vehicles considering uncertainties

被引:62
|
作者
Sedighizadeh, Mostafa [1 ]
Shaghaghi-shahr, Gholamreza [1 ]
Esmaili, Masoud [2 ]
Aghamohammadi, Mohammad Reza [1 ]
机构
[1] Shahid Beheshti Univ, Fac Elect Engn, Tehran, Iran
[2] Islamic Azad Univ, West Tehran Branch, Dept Elect Engn, Tehran, Iran
关键词
Microgrid; Optimal generation scheduling (OGS); Distributed generation (DG); Distribution feeder reconfiguration (DFR); Demand response (DR); Electric vehicles (EV); BIG CRUNCH ALGORITHM; ENERGY MANAGEMENT; NETWORK RECONFIGURATION; DISTRIBUTION-SYSTEMS; POWER ALLOCATION; DEMAND RESPONSE; OPTIMIZATION; MODELS;
D O I
10.1016/j.est.2018.11.009
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Distribution Feeder Reconfiguration (DFR) and Optimal Generation Scheduling (OGS) are indispensable operation tasks that are used in Microgrids (MGs) to enhance efficiency as well as technical and economic features of MGs. The OGS problem usually minimizes the cost of energy assuming a fixed configuration of power systems. On the other hand, the DFR problem is done assuming a predefined generation of units. However, performing these two tasks separately may lose the optimal solution. In this paper, a framework is proposed to jointly perform OGS and optimal DFR on a day-ahead time frame. The total operation cost of MG is minimized subject to diverse technical and economic constraints. The Demand Response (DR) program offered by curtailable loads is considered as a Demand Side Management (DSM) tool. The Electric Vehicles (EVs) and non-dispatchable Distributed Generations (DGs) are modeled along with the uncertainty of MG components. The charging pattern of EVs is modeled in two ways including uncontrolled and controlled patterns. The objective function includes the cost of purchasing active/reactive power from the upstream grid as well as DGs, cost of switching in DFR, cost of DR, and cost of energy losses. MG profit from selling electric energy to the upstream grid is also incorporated in the objective function. The proposed model is formulated as a Mixed-Integer Second-Order Cone Programming (MISOCP) problem and solved by the GAMS software package. The efficacy of the proposed model is confirmed by examining it on the IEEE 33-bus distribution network.
引用
下载
收藏
页码:58 / 71
页数:14
相关论文
共 50 条
  • [21] Optimal Day-Ahead Scheduling of a Smart Distribution Grid Considering Reactive Power Capability of Distributed Generation
    Yuan, Rongxiang
    Li, Timing
    Deng, Xiangtian
    Ye, Jun
    ENERGIES, 2016, 9 (05):
  • [22] An Optimal Day-Ahead Operation Strategy for Hybrid Energy Microgrid
    Elgamal, Mohamed
    Korovkin, Nikolay V.
    Refaat, Ahmed
    Elmitwally, Akram
    PROCEEDINGS OF THE 2019 IEEE CONFERENCE OF RUSSIAN YOUNG RESEARCHERS IN ELECTRICAL AND ELECTRONIC ENGINEERING (EICONRUS), 2019, : 489 - 494
  • [23] Optimal Day-Ahead Operation Considering Power Quality for Active Distribution Networks
    Tan, Yi
    Cao, Yijia
    Li, Yong
    Lee, Kwang Y.
    Jiang, Lin
    Li, Shuaihu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2017, 14 (02) : 425 - 436
  • [24] Optimal Day-ahead Scheduling of Islanded Microgrid Considering Risk-based Reserve Decision
    Liu, Zehuai
    Liu, Siliang
    Li, Qinhao
    Zhang, Yongjun
    Deng, Wenyang
    Zhou, Lai
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2021, 9 (05) : 1149 - 1160
  • [25] Optimal day-ahead scheduling strategy of microgrid considering regional pollution and potential load curtailment
    Xinghua Xie
    Hejun Yang
    Bo Wang
    Yinghao Ma
    Dabo Zhang
    Yuming Shen
    Global Energy Interconnection, 2024, 7 (06) : 749 - 760
  • [26] Optimal Day-ahead Scheduling of Islanded Microgrid Considering Risk-based Reserve Decision
    Zehuai Liu
    Siliang Liu
    Qinhao Li
    Yongjun Zhang
    Wenyang Deng
    Lai Zhou
    Journal of Modern Power Systems and Clean Energy, 2021, 9 (05) : 1149 - 1160
  • [27] Optimal day-ahead scheduling strategy of microgrid considering regional pollution and potential load curtailment
    Xie, Xinghua
    Yang, Hejun
    Wang, Bo
    Ma, Yinghao
    Zhang, Dabo
    Shen, Yuming
    Global Energy Interconnection, 2024, 7 (06) : 749 - 760
  • [28] Optimal Day-Ahead Charging Scheduling of Electric Vehicles Through an Aggregative Game Model
    Liu, Zhaoxi
    Wu, Qiuwei
    Huang, Shaojun
    Wang, Lingfeng
    Shahidehpour, Mohammad
    Xue, Yusheng
    IEEE TRANSACTIONS ON SMART GRID, 2018, 9 (05) : 5173 - 5184
  • [29] An optimization procedure for Microgrid day-ahead operation in the presence of CHP facilities
    Aluisio, B.
    Dicorato, M.
    Forte, G.
    Trovato, M.
    SUSTAINABLE ENERGY GRIDS & NETWORKS, 2017, 11 : 34 - 45
  • [30] Optimal Day-ahead Scheduling for Microgrid Participation in Frequency Regulation Markets
    Baone, Chaitanya A.
    Acharya, Naresh
    Wiegman, Herman L. N.
    2016 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE (ISGT), 2016,