How lean can lean buffers be?

被引:27
|
作者
Enginarlar, E
Li, JS
Meerkov, SM [1 ]
机构
[1] Univ Michigan, Dept Elect Engn & Comp Sci, Ann Arbor, MI 48109 USA
[2] Los Alamos Natl Lab, Decis Applicat Div, Los Alamos, NM 87545 USA
[3] GM Res & Dev Ctr, Mfg Syst Res Lab, Warren, MI 48090 USA
基金
美国国家科学基金会;
关键词
D O I
10.1080/07408170590916878
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper provides a quantitative characterization of the smallest, i.e., lean, buffer capacity necessary and sufficient to attain a desired throughput in serial production lines with identical exponential machines. The development is carried out in terms of normalized buffer capacity and production line efficiency. The smallest normalized buffer capacity required to ensure the desired line efficiency is referred to as the Lean Level of Buffering (LLB). Exact formulas for the LLB in two- and three-machine lines are presented and an approximate expression for the LLB in lines with more than three machines is derived. Along with these analytical results, several qualitative insights into the nature of lean buffering in serial production lines are presented.
引用
收藏
页码:333 / 342
页数:10
相关论文
共 50 条
  • [41] How Can We Help People to Develop Lean and Healthy Bodies? A New Perspective
    Gutin, Bernard
    RESEARCH QUARTERLY FOR EXERCISE AND SPORT, 2013, 84 (01) : 1 - 5
  • [42] HOW CAN WE ACHIEVE STANDARDIZATION OF APPENDICULAR LEAN BODY MASS (ALBM) ASSESSMENT?
    Engelke, K.
    OSTEOPOROSIS INTERNATIONAL, 2017, 28 : S81 - S82
  • [43] Lean to the left, lean to the right
    Joseph, T
    NATION, 1998, 266 (12) : 2 - 2
  • [44] Lean or flabby? [lean manufacturing]
    Manuf., 2007, 5 (36-39):
  • [45] Lean maturity, lean sustainability
    Jorgensen, Frances
    Matthiesen, Rikke
    Nielsen, Jacob
    Johansen, John
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS, 2007, 246 : 371 - +
  • [46] LEAN TIME + LEAN,DAVID
    HOUSTON, P
    SIGHT AND SOUND, 1985, 54 (02): : 82 - 82
  • [47] Lean initiatives and lean learning
    Hogan, BJ
    MANUFACTURING ENGINEERING, 2003, 130 (05): : 115 - 119
  • [48] Flashback and Lean Blow Out study of a Lean Premixed Pre-Vaporized Can Combustor
    Verma, Harendra K.
    Kumar, Arvind
    Kumar, Keshav
    Mohammed, Rinaz
    PROCEEDINGS OF THE ASME GAS TURBINE INDIA CONFERENCE, 2017, VOL 1, 2018,
  • [49] Lean data for lean production
    Müller, Rainer
    Blum, Anne
    Mende, Leonie
    Decker, Jacob
    Wilhelm, Yannick
    WT Werkstattstechnik, 2020, 110 (09): : 639 - 644
  • [50] Is local authority procurement 'lean'? An exploration to determine if 'lean' can provide a useful explanation of practice
    Loader, Kim
    JOURNAL OF PURCHASING AND SUPPLY MANAGEMENT, 2010, 16 (01) : 41 - 50