A hybrid algorithm based on particle swarm optimization and simulated annealing for a periodic job shop scheduling problem

被引:36
|
作者
Jamili, Amin [1 ]
Shafia, Mohammad Ali [1 ]
Tavakkoli-Moghaddam, Reza [2 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[2] Univ Tehran, Dept Ind Engn, Coll Engn, Tehran, Iran
关键词
Periodic job shop scheduling; Periodic event scheduling problem; Particle swarm optimization; Simulated annealing; GENETIC-ALGORITHM; TABU SEARCH; MINIMIZE; MODEL;
D O I
10.1007/s00170-010-2932-8
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Generating schedules such that all operations are repeated every constant period of time is as important as generating schedules with minimum delays in all cases where a known discipline is desired or obligated by stakeholders. In this paper, a periodic job shop scheduling problem (PJSSP) based on the periodic event scheduling problem (PESP) is presented, which deviates from the cyclic scheduling. The PESP schedules a number of recurring events as such that each pair of event fulfills certain constraints during a given fixed time period. To solve such a hard PJSS problem, we propose a hybrid algorithm, namely PSO-SA, based on particle swarm optimization (PSO) and simulated annealing (SA) algorithms. To evaluate this proposed PSO-SA, we carry out some randomly constructed instances by which the related results are compared with the proposed SA and PSO algorithms as well as a branch-and-bound algorithm. In addition, we compare the results with a hybrid algorithm embedded with electromagnetic-like mechanism and SA. Moreover, three lower bounds (LBs) are studied, and the gap between the found LBs and the best found solutions are reported. The outcomes prove that the proposed hybrid algorithm is an efficient and effective tool to solve the PJSSP.
引用
收藏
页码:309 / 322
页数:14
相关论文
共 50 条
  • [21] A Hybrid Particle Swarm Optimization Algorithm for Solving Job Shop Scheduling Problems
    Meng, Qiaofeng
    Zhang, Linxuan
    Fan, Yushun
    [J]. THEORY, METHODOLOGY, TOOLS AND APPLICATIONS FOR MODELING AND SIMULATION OF COMPLEX SYSTEMS, PT II, 2016, 644 : 71 - 78
  • [22] General particle swarm optimization algorithm for job-shop scheduling problem
    Sch. of Mechanical Sci. and Eng., Huazhong Univ. of S and T, Wuhan 430074, China
    [J]. Jisuanji Jicheng Zhizao Xitong, 2006, 6 (911-917+923):
  • [23] A Grouping Particle Swarm Optimization Algorithm for Flexible Job Shop Scheduling Problem
    Feng, Mingyue
    Yi, Xianqing
    Li, Guohui
    Tang, Shaoxun
    Jun, He
    [J]. PACIIA: 2008 PACIFIC-ASIA WORKSHOP ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION, VOLS 1-3, PROCEEDINGS, 2008, : 318 - 322
  • [24] Erratum to: A hybrid discrete particle swarm optimization algorithm for solving fuzzy job shop scheduling problem
    Jun-qing Li
    Yu-xia Pan
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 66 (1-4) : 597 - 600
  • [25] Hybrid of human learning optimization algorithm and particle swarm optimization algorithm with scheduling strategies for the flexible job-shop scheduling problem
    Ding, Haojie
    Gu, Xingsheng
    [J]. NEUROCOMPUTING, 2020, 414 (414) : 313 - 332
  • [26] A two-stage hybrid particle swarm optimization algorithm for the stochastic job shop scheduling problem
    Zhang, Rui
    Song, Shiji
    Wu, Cheng
    [J]. KNOWLEDGE-BASED SYSTEMS, 2012, 27 : 393 - 406
  • [27] A new algorithm for flexible job-shop scheduling problem based on particle swarm optimization
    Teekeng W.
    Thammano A.
    Unkaw P.
    Kiatwuthiamorn J.
    [J]. Artificial Life and Robotics, 2016, 21 (01) : 18 - 23
  • [28] Immune simulated annealing algorithm for the job shop scheduling problem
    Zhang, Rui
    Wu, Cheng
    [J]. Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2008, 19 (23): : 2824 - 2829
  • [29] Investigation of particle swarm optimization for job shop scheduling problem
    Liu, Zhixiong
    [J]. ICNC 2007: THIRD INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 3, PROCEEDINGS, 2007, : 799 - 803
  • [30] A neighbourhood property for the job shop scheduling problem with application to hybrid particle swarm optimization
    Zhang, Rui
    Wu, Cheng
    [J]. IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2013, 24 (01) : 111 - 134