共 50 条
- [22] DERIVATION OF PRODUCTION FUNCTIONS WITH THE AID OF BERNOULLI METHOD [J]. PUBLIC FINANCE-FINANCES PUBLIQUES, 1980, 35 (03): : 436 - 438
- [23] Data-Enabled Permanent Production Loss Analysis for Serial Production Systems With Variable Cycle Time Machines [J]. IEEE ROBOTICS AND AUTOMATION LETTERS, 2021, 6 (04): : 6418 - 6425
- [24] NEW TECHNIQUES IN MODELING CATTLE PRODUCTION SYSTEMS [J]. NEW TECHNIQUES IN CATTLE PRODUCTION, 1989, : 180 - 205
- [25] PRODUCTION PLAN FOR SERIAL PROCESS WITH YIELD LOSS [J]. INDUSTRIAL ENGINEERING, 1987, 19 (07): : 18 - &
- [27] Method of modeling of the control systems adapted to the skills production systems [J]. International Journal of Circuits, Systems and Signal Processing, 2019, 13 : 385 - 390
- [28] Method Of Modeling Of The Control Systems Adapted To The Skills Production Systems [J]. 2018 2ND EUROPEAN CONFERENCE ON ELECTRICAL ENGINEERING AND COMPUTER SCIENCE (EECS 2018), 2018, : 248 - 252
- [29] PLANNED LEADTIMES FOR SERIAL PRODUCTION SYSTEMS [J]. IIE TRANSACTIONS, 1987, 19 (03) : 300 - 307
- [30] Serial agile production systems with automation [J]. OPERATIONS RESEARCH, 2005, 53 (05) : 852 - 866