Fatigue reliability of deteriorating prestressed concrete bridges due to stress corrosion cracking

被引:9
|
作者
Maes, MA [1 ]
Wei, X [1 ]
Dilger, WH [1 ]
机构
[1] Univ Calgary, Dept Civil Engn, Calgary, AB T2N 1N4, Canada
关键词
fatigue analysis; prestressing strands; stress corrosion cracking; reliability assessment; prestressed concrete bridges; deterioration;
D O I
10.1139/cjce-28-4-673
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, an analysis framework is presented to develop a relationship between fatigue reliability in a prestressed concrete bridge and the progress of stress corrosion cracking (SCC) in prestressing steel. The fatigue limit state uses a cumulative damage model for prestressing steel wires, which is a function of both stress range and minimum stress. The SCC model takes into account varying degrees of material susceptibility, stress regimes, and environmental conditions and is structured around three stages: initiation of micro-cracking, propagation, and macro-crack instability using linear elastic fracture mechanics. The framework is an overall time-dependent analysis of the safety against fatigue of a prestressed concrete bridge. It involves a stochastic analysis of the evolution of prestressing wire corrosion as a function of time and a time-dependent probabilistic analysis of the fatigue reliability of the prestressed concrete bridge suffering a certain degree of deterioration. The uncertainties involved in the fatigue model, the SCC model, and traffic actions are considered. The updating of uncertainties is simplified by considering a limited number of classes representative of the severity of SCC exposure. The framework is applied to three deteriorating highway bridges.
引用
收藏
页码:673 / 683
页数:11
相关论文
共 50 条
  • [31] Reliability-based optimal next inspection time of prestressed concrete bridges including the effect of corrosion deterioration
    De Leon, David
    Diaz Camacho, Sergio
    Gonzalez Perez, Carlos Alberto
    REVISTA TECNICA DE LA FACULTAD DE INGENIERIA UNIVERSIDAD DEL ZULIA, 2013, 36 (02): : 114 - 121
  • [32] Prediction of strand corrosion damage in prestressed concrete beams through visual inspection of corrosion concrete cracking
    Ahmed, Mshtaq
    El-Sayed, Ahmed K.
    Alhozaimy, Abdulrahman M.
    Al-Negheimish, Abdulaziz I.
    Alabdulkarim, Abdullah
    CONSTRUCTION AND BUILDING MATERIALS, 2024, 416
  • [34] Fatigue Assessment of Prestressed Concrete Slab-Between-Girder Bridges
    Lantsoght, Eva O. L.
    Koekkoek, Rutger
    van der Veen, Cor
    Sliedrecht, Henk
    APPLIED SCIENCES-BASEL, 2019, 9 (11):
  • [35] Load Spectrum and Fatigue Life Computer Analysis of Prestressed Concrete Bridges
    Xin Qin
    Dou Yuanming
    Chen Wan
    INTERNATIONAL JOURNAL OF SECURITY AND ITS APPLICATIONS, 2015, 9 (07): : 247 - 265
  • [36] Reliability-based sensitivity analysis for prestressed concrete girder bridges
    Marti-Vargas, Jose R.
    PCI JOURNAL, 2014, : 129 - 130
  • [37] Random field-based reliability analysis of prestressed concrete bridges
    Jin Cheng
    KSCE Journal of Civil Engineering, 2014, 18 : 1436 - 1445
  • [38] Random field-based reliability analysis of prestressed concrete bridges
    Cheng, Jin
    KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (05) : 1436 - 1445
  • [39] Reliability-based sensitivity analysis for prestressed concrete girder bridges
    Martí-Vargas, José R., 1600, Precast/Prestressed Concrete Institute (59):
  • [40] A global model for corrosion-induced cracking in prestressed concrete structures
    Dai, Lizhao
    Wang, Lei
    Zhang, Jianren
    Zhang, Xuhui
    ENGINEERING FAILURE ANALYSIS, 2016, 62 : 263 - 275