Applying the analytic hierarchy process to evaluation of the national nuclear R&D projects: The case of Korea

被引:21
|
作者
Shin, Chul-Oh
Yoo, Seung-Hoon
Kwak, Seung-Jun
机构
[1] Hoseo Univ, Sch Business & Econ, Cheonan 330713, South Korea
[2] Korea Maritime Inst, Coastal & Ocean Policy Res Dept, Seoul 10274, South Korea
[3] Korea Univ, Dept Econ, Seoul 136701, South Korea
关键词
analytic hierarchy process; decision-making; national R&D project; project evaluation;
D O I
10.1016/j.pnucene.2007.03.001
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Researchers, institutes. and government involved in research and development (R&D) are faced with the problem of performing R&D project evaluations. As a real-world case of evaluation, we elicited and reproduced the evaluation process of the national nuclear R&D projects, using a specific case study of Korea for the year 2001. In the methodology, the analytic hierarchy process is employed to evaluate and rank the selected nuclear R&D projects which have a wide range of evaluation objectives and characteristics. This article presents a derivation of a wide range of objectives, evaluation viewpoints from research professionals and evaluators, and evaluation criteria. To structure and quantify the criteria and research performance of some selected projects, we elicited strategic objectives, then refined and structured them into a hierarchy. The method and implications can be easily understood and applied by practitioners since they follow the standard practice of evaluation and relative comparisons of performance using evaluation procedures. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:375 / 384
页数:10
相关论文
共 50 条
  • [21] Strategic priority of Green ICT policy in Korea: Applying analytic hierarchy process
    Graduate School of Information, Yonsei University, Korea, Republic of
    不详
    [J]. World Acad. Sci. Eng. Technol., 2009, (16-20):
  • [22] Employee Selection - Case Study Applying Analytic Hierarchy Process
    Kiszova, Zuzana
    [J]. 34TH INTERNATIONAL CONFERENCE MATHEMATICAL METHODS IN ECONOMICS (MME 2016), 2016, : 401 - 406
  • [23] Development of an evaluation framework for publicly funded R&D projects: The case of Korea's Next Generation Network
    Kim, Eungdo
    Kim, Soyoung
    Kim, Hongbum
    [J]. EVALUATION AND PROGRAM PLANNING, 2017, 63 : 18 - 28
  • [24] An analytic hierarchy process approach with linguistic variables for selection of an R&D strategic alliance partner
    Chen, Sheu Hua
    Wang, Pei Wen
    Chen, Chien Min
    Lee, Hong Tau
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (02) : 278 - 287
  • [25] Assessing Value-Based Plans in Public R&D Using the Analytic Hierarchy Process
    Meesapawong, Pawadee
    Rezgui, Yacine
    Li, Haijiang
    [J]. COLLABORATIVE NETWORKS IN THE INTERNET OF SERVICES, 2012, 380 : 310 - 317
  • [26] Public financing of cooperative R&D projects in Spain: the Concerted Projects under the National R&D Plan
    Ballesteros, JA
    Rico, AM
    [J]. RESEARCH POLICY, 2001, 30 (04) : 625 - 641
  • [27] A study on the architecture of performance evaluation system of national R&D programs in Korea
    Oh, Donghoon
    Byeon, Soon Cheon
    Park, Young-Il
    Lee, Sang Youb
    [J]. PICMET '07: PORTLAND INTERNATIONAL CENTER FOR MANAGEMENT OF ENGINEERING AND TECHNOLOGY, VOLS 1-6, PROCEEDINGS: MANAGEMENT OF CONVERGING TECHNOLOGIES, 2007, : 382 - +
  • [28] The improvement of spin-offs from national nuclear R&D activities in Korea
    Lee, TJ
    Yang, MH
    Bae, ZT
    [J]. NUCLEAR ENERGY-JOURNAL OF THE BRITISH NUCLEAR ENERGY SOCIETY, 1998, 37 (05): : 337 - 341
  • [29] ASSESSMENT SYSTEM FOR FEASIBILITY ANALYSIS OF NATIONAL R&D PROGRAMS: THE CASE OF KOREA
    Lee, Yoon
    Park, Jiyoung
    [J]. INTERNATIONAL JOURNAL OF INNOVATION AND TECHNOLOGY MANAGEMENT, 2011, 8 (04) : 661 - 676
  • [30] Evaluation of big R&D projects. A comparison between the case of the brite Euram projects and the case of the space projects
    Bach, L.
    Cohendet, P.
    Ledoux, M.
    [J]. International Journal of Technology Management, 10 (4-6):