Learning and forgetting effects on a group scheduling problem

被引:37
|
作者
Yang, Wen-Hua [1 ]
Chand, Suresh [2 ]
机构
[1] Chaoyang Univ Technol, Dept Business Adm, Taichung 413, Taiwan
[2] Purdue Univ, Krannert Sch Management, W Lafayette, IN 47907 USA
关键词
group scheduling; setup times; learning effect; forgetting effect;
D O I
10.1016/j.ejor.2006.03.065
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper proposes to investigate learning and forgetting effects on the problem of scheduling families of jobs on a single machine to minimize total completion time of jobs. A setup time is incurred whenever the single machine transfers job processing from a family to another family. To analyze the impact of learning and forgetting on this group scheduling problem, we structure three basic models and make some comparisons through computational experiments. The three models, including no forgetting, total forgetting and partial forgetting, assume that the processing time of a job is dependent on its position in a schedule. Some scheduling rules and a lower bound are derived in order to constitute our branch-and-bound algorithm for searching an optimal sequence. In addition, an efficient and simply-structured heuristic is also built to find a near-optimal schedule. (C) 2006 Elsevier B.V. All rights reserved.
引用
下载
收藏
页码:1033 / 1044
页数:12
相关论文
共 50 条
  • [21] A note on single-machine group scheduling problem with a general learning function
    Liu, Han-Chu
    Lee, Wen-Chiung
    Wu, Chin-Chia
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2008, 11 (04): : 645 - 652
  • [22] Learning and forgetting effects on maintenance outsourcing
    Tarakci, Hakan
    Tang, Kwei
    Teyarachakul, Sunantha
    IIE TRANSACTIONS, 2013, 45 (04) : 449 - 463
  • [23] A note on single-machine scheduling with sum-of-processing-time-based learning and forgetting effects
    Wu, Chia-Huang
    Lai, Peng-Jen
    Lee, Wen-Chiung
    APPLIED MATHEMATICAL MODELLING, 2015, 39 (02) : 415 - 424
  • [24] Scheduling Repetitive Construction Processes Using the Learning-Forgetting Theory
    Biruk, Slawomir
    Rzepecki, Lukasz
    3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
  • [25] Single-machine Group Scheduling Problems with Deterioration and Learning Effects
    Yan, Yang
    Wang, Dazhi
    Wang, Dingwei
    Wang, Hongfeng
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 4933 - 4936
  • [26] Single-machine group scheduling with general deterioration and learning effects
    Bai, Jing
    Li, Zhi-Rong
    Huang, Xue
    APPLIED MATHEMATICAL MODELLING, 2012, 36 (03) : 1267 - 1274
  • [27] A Group-Dependent Due Window Assignment Scheduling Problem with Controllable Learning Effect
    Chen, Ke
    Han, Songqiao
    Huang, Hailiang
    Ji, Min
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (03)
  • [28] Modelling production cost with the effects of learning and forgetting
    Lolli, Francesco
    Messori, Michael
    Gamberini, Rita
    Rimini, Bianca
    Balugani, Elia
    IFAC PAPERSONLINE, 2016, 49 (12): : 503 - 508
  • [29] Imperfect production process with learning and forgetting effects
    Jaber M.Y.
    Givi Z.S.
    Computational Management Science, 2015, 12 (1) : 129 - 152
  • [30] Organizational learning and forgetting: The effects of turnover and structure
    Rao, Rukmini Devadas
    Argote, Linda
    EUROPEAN MANAGEMENT REVIEW, 2006, 3 (02) : 77 - 85