Reliability-Based Maintenance Strategy for Gusset Plate Connections in Steel Bridges Based on Life-Cost Optimization

被引:17
|
作者
Liu, Zhongxiang [1 ]
Guo, Tong [2 ]
Correia, Jose [3 ,4 ]
Wang, Libin [5 ]
机构
[1] Southeast Univ, Lab Concrete & Prestressed Concrete Struct, Minist Educ, Nanjing 210096, Peoples R China
[2] Southeast Univ, Key Lab Concrete & Prestressed Concrete Struct, Minist Educ, Nanjing 210096, Peoples R China
[3] Univ Porto, CONSTRUCT, P-4200465 Porto, Portugal
[4] Univ Porto, Fac Engn, P-4200465 Porto, Portugal
[5] Nanjing Forestry Univ, Coll Civil Engn, Nanjing 210037, Peoples R China
基金
中国国家自然科学基金;
关键词
Reliability; Gusset plate connection; Life cost; Performance deterioration; Particle swarm optimization; Damage accumulation; Maintenance; PARTICLE SWARM OPTIMIZATION; REACTIVE POWER; BOX-GIRDER; FATIGUE; DETAILS; SAFETY; SPAN; MANAGEMENT;
D O I
10.1061/(ASCE)CF.1943-5509.0001493
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper focuses on the maintenance decision of vulnerable parts that need rehabilitating within the design service period under repetitive vehicular loads in steel bridges based on the time-variant performance deterioration and life-cost optimization. A practical life-cost reliability-based method was developed to characterize the performance deterioration of critical parts without and with maintenance, and then evaluate maintenance strategies according to life-cost indicators. The time-variant reliability index was mathematically derived according to the damage accumulation rule and life-cost optimization was established to determine the optimal maintenance strategy using particle swarm optimization. The developed method was effectively applied in the optimization analysis of the tube-gusset connection. Four maintenance measures, including plug welding, drilling the crack-stop hole, the welding plate, and changing the bolted channel-gusset connection, were used in longitudinal truss diaphragms of the Second Nanjing Yangzi Bridge and analyzed in a single form and in combination, respectively. It is observed that a single maintenance cannot protect the tube-gusset connection from damage failure within the expected service life (i.e., 100 years) for the restriction on the maintenance frequency, while the combined maintenances with bolted channel-gusset connection do much better than those with welded plate in protecting the detail from damage failure. The optimization results can provide an important basis for maintenance and design, where the optimal maintenance is effectively addressed. (c) 2020 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Reliability-based assessment of life cycle cost effectiveness and economic efficiency for optimal seismic upgrading of bridges
    Cho, HN
    An, JS
    Lim, JK
    PROCEEDINGS OF US-KOREA WORKSHOP ON NEW FRONTIER IN INFRASTRUCTURAL/SEISMIC ENGINEERING, 2000, : 305 - 318
  • [42] Reliability-based assessment of ageing bridges using risk ranking and life cycle cost decision analyses
    Stewart, MG
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2001, 74 (03) : 263 - 273
  • [43] Reliability-based optimization of river bridges using artificial intelligence techniques
    Turan, K. Hakan
    Yanmaz, A. Melih
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2011, 38 (10) : 1103 - 1111
  • [44] Optimum reliability-based inspection/repair strategy based on minimum expected cost
    Estes, AC
    Frangopol, DM
    STRUCTURAL SAFETY AND RELIABILITY, VOLS. 1-3, 1998, : 279 - 286
  • [45] Tradeoff of weight and inspection cost in reliability-based structural optimization
    Kale, Amit A.
    Haftka, Raphael T.
    Journal of Aircraft, 1600, 45 (01): : 77 - 85
  • [46] A sequential approximate programming strategy for reliability-based structural optimization
    Cheng, Gengdong
    Xu, Lin
    Jiang, Lei
    COMPUTERS & STRUCTURES, 2006, 84 (21) : 1353 - 1367
  • [47] Reliability-based leading edge erosion maintenance strategy selection framework
    Lopez, Javier Contreras
    Kolios, Athanasios
    Wang, Lin
    Chiachio, Manuel
    Dimitrov, Nikolay
    APPLIED ENERGY, 2024, 358
  • [48] Tradeoff of weight and inspection cost in reliability-based structural optimization
    Kale, Amit A.
    Haftka, Raphael T.
    JOURNAL OF AIRCRAFT, 2008, 45 (01): : 77 - 85
  • [49] Study on the optimization of maintenance strategy based on life cycle cost estimate of transformer
    Chao, Sun, 1600, Transport and Telecommunication Institute, Lomonosova street 1, Riga, LV-1019, Latvia (18):
  • [50] Reliability-based optimal maintenance scheduling by considering maintenance effect effect to reduce cost
    Zhang, T
    Nakamura, M
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2005, 21 (02) : 203 - 220